| Biomass 399 MW grid connection at Lynemouth Power Direct | England, United Kingdom | Grid operator | 399 MW |
| Battery storage and Solar 320.3 MW grid connection at Colliery Farm SPV & BESS Direct | England, United Kingdom | Grid operator | 320 MW |
| Battery storage 250 MW grid connection at Old Hill Farm Direct | England, United Kingdom | Grid operator | 250 MW |
| Battery storage and Solar 200 MW grid connection at Clock and Grimeston Farm Direct | England, United Kingdom | Grid operator | 200 MW |
| Solar 200 MW grid connection at Scampston Solar Direct | England, United Kingdom | Grid operator | 200 MW |
| Mill Lane Solar PV grid connection | England, United Kingdom | Grid operator | 180 MW |
| Solar 180 MW grid connection at Mill Lane Direct | England, United Kingdom | Grid operator | 180 MW |
| Battery storage 175 MW grid connection at West Boldon Farm BESS Direct | England, United Kingdom | Grid operator | 175 MW |
| Battery storage and Solar 160 MW grid connection at Sheriff Hutton 80MW Hybrid | England, United Kingdom | Grid operator | 160 MW |
| Battery storage and Solar 150 MW grid connection at California Farm Direct | England, United Kingdom | Grid operator | 150 MW |
| Battery storage and Solar 150 MW grid connection at Dewley Hill Direct | England, United Kingdom | Grid operator | 150 MW |
| Court Green Farm grid connection | England, United Kingdom | Grid operator | 125 MW |
| Battery storage 118.8 MW grid connection at Porch House Farm BESS Direct | England, United Kingdom | Grid operator | 119 MW |
| Battery storage 118.5 MW grid connection at Thornley Close Farm Direct | England, United Kingdom | Grid operator | 119 MW |
| Battery storage and Solar 118.5 MW grid connection at Salters Lane PV | England, United Kingdom | Grid operator | 119 MW |
| Battery storage and Solar 115.5 MW grid connection at Sagglethorpe Hybrid | England, United Kingdom | Grid operator | 116 MW |
| Battery storage and Solar 114 MW grid connection at Knapton Generation Direct | England, United Kingdom | Grid operator | 114 MW |
| Battery storage and Solar 112 MW grid connection at Carr Edge Farm BESS | England, United Kingdom | Grid operator | 112 MW |
| Battery storage 105.6 MW grid connection at Cross Lane BESS Direct | England, United Kingdom | Grid operator | 106 MW |
| Battery storage 105.1 MW grid connection at Murton Way BESS Direct | England, United Kingdom | Grid operator | 105 MW |
| Battery storage 104.4 MW grid connection at Thinford BESS Direct | England, United Kingdom | Grid operator | 104 MW |
| Solar 104 MW grid connection at High Moorsley Solar and BESS Direct | England, United Kingdom | Grid operator | 104 MW |
| Solar 104 MW grid connection at Sikbereen Solar Direct | England, United Kingdom | Grid operator | 104 MW |
| Battery storage 101.3 MW grid connection at Woodland BESS | England, United Kingdom | Grid operator | 101 MW |
| Battery storage 100.92 MW grid connection at Belasis Avenue BESS Direct | England, United Kingdom | Grid operator | 101 MW |
| Battery storage and Solar 100.6 MW grid connection at Hopewell House Direct | England, United Kingdom | Grid operator | 101 MW |
| Battery storage and Solar 100.4 MW grid connection at Chopwell Hybrid | England, United Kingdom | Grid operator | 100 MW |
| West House Hybrid PV % BESS grid connection | England, United Kingdom | Grid operator | 100 MW |
| Atterwith Lane grid connection | England, United Kingdom | Grid operator | 100 MW |
| Battery storage 100 MW grid connection at Hawthorn Coke Works | England, United Kingdom | Grid operator | 100 MW |
| Battery storage 100 MW grid connection at Southeast of Church Lane BESS Direct | England, United Kingdom | Grid operator | 100 MW |
| Battery storage 100 MW grid connection at The Tavern BESS Direct | England, United Kingdom | Grid operator | 100 MW |
| Battery storage and Solar 100 MW grid connection at Bowburn SPV and BESS | England, United Kingdom | Grid operator | 100 MW |
| Battery storage and Solar 100 MW grid connection at Thrushwood Farm BESS | England, United Kingdom | Grid operator | 100 MW |
| Gas 100 MW grid connection at Port Clarence Gas Direct | England, United Kingdom | Grid operator | 100 MW |
| Solar 99.9 MW grid connection at North Lane PV Direct | England, United Kingdom | Grid operator | 99.9 MW |
| Battery storage 99.8 MW grid connection at Newcastle BESS Direct | England, United Kingdom | Grid operator | 99.8 MW |
| Battery storage and Solar 99.8 MW grid connection at Birdstall Estate Hybrid | England, United Kingdom | Grid operator | 99.8 MW |
| Solar 99.75 MW grid connection at Low Moor Lane Direct | England, United Kingdom | Grid operator | 99.8 MW |
| Battery storage 99.4 MW grid connection at Maiden Hill Farm BESS Direct | England, United Kingdom | Grid operator | 99.4 MW |
| Battery storage and Solar 99 MW grid connection at Greatham Hybrid | England, United Kingdom | Grid operator | 99 MW |
| Battery storage 96.24 MW grid connection at Old Neolith Building BESS Direct | England, United Kingdom | Grid operator | 96.2 MW |
| Battery storage 94.5 MW grid connection at Coney Garth 94.5MW BESS | England, United Kingdom | Grid operator | 94.5 MW |
| Battery storage and Solar 92.9 MW grid connection at Harperley Lane Direct | England, United Kingdom | Grid operator | 92.9 MW |
| Battery storage and Solar 90.97 MW grid connection at Overton Grange | England, United Kingdom | Grid operator | 91 MW |
| Battery storage and Solar 89.89 MW grid connection at Norton Back Lane Direct | England, United Kingdom | Grid operator | 89.9 MW |
| Battery storage 80 MW grid connection at Newburn Bridge BESS Direct | England, United Kingdom | Grid operator | 80 MW |
| Battery storage and Solar 80 MW grid connection at Fourstones Hybrid | England, United Kingdom | Grid operator | 80 MW |
| Solar 80 MW grid connection at Hell Hole Farm Direct | England, United Kingdom | Grid operator | 80 MW |
| Gas 76 MW grid connection at Phillips Petroleum | England, United Kingdom | Grid operator | 76 MW |
| Battery storage and Solar 75.5 MW grid connection at Leyton Hybrid | England, United Kingdom | Grid operator | 75.5 MW |
| Battery storage and Solar 75 MW grid connection at High Barnes Farm Hybrid | England, United Kingdom | Grid operator | 75 MW |
| Land south of Skeeby Substation grid connection | England, United Kingdom | Grid operator | 73.2 MW |
| Battery storage and Solar 71.3 MW grid connection at Carr House | England, United Kingdom | Grid operator | 71.3 MW |
| Battery storage 71 MW grid connection at Birtley BESS | England, United Kingdom | Grid operator | 71 MW |
| West Sleek Burn BESS grid connection | England, United Kingdom | Grid operator | 70 MW |
| Whiley Hill Farm grid connection | England, United Kingdom | Grid operator | 64.3 MW |
| Battery storage 63 MW grid connection at West Boldon BESS | England, United Kingdom | Grid operator | 63 MW |
| Battery storage and Solar 62.5 MW grid connection at Bucks Head Hybrid | England, United Kingdom | Grid operator | 62.5 MW |
| Teesside Windfarm Ltd grid connection | England, United Kingdom | Grid operator | 62 MW |
| Battery storage and Solar 61.9 MW grid connection at Harmony BESS | England, United Kingdom | Grid operator | 61.9 MW |
| Battery storage and Solar 61.9 MW grid connection at Stanley Farm Hybrid | England, United Kingdom | Grid operator | 61.9 MW |
| Gas 61.75 MW grid connection at Viking Power | England, United Kingdom | Grid operator | 61.8 MW |
| Battery storage 60 MW grid connection at Wheatlands BESS | England, United Kingdom | Grid operator | 60 MW |
| Benridge Solar grid connection | England, United Kingdom | Grid operator | 60 MW |
| Battery storage and Solar 59.9 MW grid connection at Low Bohemia BESS Direct | England, United Kingdom | Grid operator | 59.9 MW |
| Battery storage and Solar 59.8 MW grid connection at Broadway House PV | England, United Kingdom | Grid operator | 59.8 MW |
| Blyth Offshore Windfarm grid connection | England, United Kingdom | Grid operator | 58.4 MW |
| Holmside Hall PV grid connection | England, United Kingdom | Grid operator | 55.9 MW |
| Battery storage and Solar 55 MW grid connection at Salton Lane Hybrid | England, United Kingdom | Grid operator | 55 MW |
| Wind 54.4 MW grid connection at Ray Fell Windfarm | England, United Kingdom | Grid operator | 54.4 MW |
| Battery storage 54.34 MW grid connection at Greencroft BESS | England, United Kingdom | Grid operator | 54.3 MW |
| Wind 54.15 MW grid connection at Middlemoor Windfarm | England, United Kingdom | Grid operator | 54.2 MW |
| Battery storage 54 MW grid connection at Lemington BESS Direct | England, United Kingdom | Grid operator | 54 MW |
| Solar 53.9 MW grid connection at Manor Farm Direct | England, United Kingdom | Grid operator | 53.9 MW |
| Solar 52.8 MW grid connection at Holywell Direct | England, United Kingdom | Grid operator | 52.8 MW |
| Battery storage and Solar 52.5 MW grid connection at Highfield Lodge Hybrid | England, United Kingdom | Grid operator | 52.5 MW |
| Battery storage and Solar 52 MW grid connection at Addison Road Hybrid | England, United Kingdom | Grid operator | 52 MW |
| Solar 52 MW grid connection at Ketton Solar Direct | England, United Kingdom | Grid operator | 52 MW |
| Battery storage and Solar 51.87 MW grid connection at Stripe Lane Hybrid | England, United Kingdom | Grid operator | 51.9 MW |
| Battery storage 50.7 MW grid connection at Fylands Bridge BESS | England, United Kingdom | Grid operator | 50.7 MW |
| Battery storage 50 MW grid connection at Fenwick Pit BESS Direct | England, United Kingdom | Grid operator | 50 MW |
| Battery storage 50 MW grid connection at Preston Direct | England, United Kingdom | Grid operator | 50 MW |
| Battery storage 50 MW grid connection at TeesCAES Storage Direct | England, United Kingdom | Grid operator | 50 MW |
| Battery storage 50 MW grid connection at Wadsworth Farm BESS Direct | England, United Kingdom | Grid operator | 50 MW |
| Broadway House Farm grid connection | England, United Kingdom | Grid operator | 50 MW |
| Gas 50 MW grid connection at Phillips Petroleum | England, United Kingdom | Grid operator | 50 MW |
| Solar 50 MW grid connection at Brafferton Solar Farm Direct | England, United Kingdom | Grid operator | 50 MW |
| Solar 50 MW grid connection at Skeeby Solar | England, United Kingdom | Grid operator | 50 MW |
| Whelley Hill Farm grid connection | England, United Kingdom | Grid operator | 50 MW |
| Hulam Farm grid connection | England, United Kingdom | Grid operator | 50 MW |
| RSPB Saltholme grid connection | England, United Kingdom | Grid operator | 50 MW |
| RSPB Saltholme grid connection | England, United Kingdom | Grid operator | 50 MW |
| Battery storage 49.9 MW grid connection at Brenda Road 49.9MW BESS | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.9 MW grid connection at Coalburn Farm BESS | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.9 MW grid connection at Flatworth BESS | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.9 MW grid connection at Hawthorn Pit Bess | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.9 MW grid connection at Hull Road BESS Direct | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.9 MW grid connection at Hull Road BESS Direct | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.9 MW grid connection at Scotswood Road BESS Direct | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage and Solar 49.9 MW grid connection at Harehill Farm Hybrid | England, United Kingdom | Grid operator | 49.9 MW |
| Solar 49.9 MW grid connection at Dawnay Solar Farm | England, United Kingdom | Grid operator | 49.9 MW |
| Solar 49.9 MW grid connection at Wheatlands BESS | England, United Kingdom | Grid operator | 49.9 MW |
| Solar 49.9 MW grid connection at Woolpots Farm PV | England, United Kingdom | Grid operator | 49.9 MW |
| Waste 49.9 MW grid connection at Tees Valley Energy | England, United Kingdom | Grid operator | 49.9 MW |
| Gas 49.894 MW grid connection at Worset Lane Generation | England, United Kingdom | Grid operator | 49.9 MW |
| Battery storage 49.5 MW grid connection at Fence Dyke Lane BESS | England, United Kingdom | Grid operator | 49.5 MW |
| Hedley Hope Farm grid connection | England, United Kingdom | Grid operator | 49.5 MW |
| Biomass 49 MW grid connection at Port Clarence Biomass Direct | England, United Kingdom | Grid operator | 49 MW |
| Solar 49 MW grid connection at High Cayton Solar Direct | England, United Kingdom | Grid operator | 49 MW |
| Battery storage 46.55 MW grid connection at Morrow Edge Solar | England, United Kingdom | Grid operator | 46.6 MW |
| Solar 46.55 MW grid connection at Hett Moor Solar Direct | England, United Kingdom | Grid operator | 46.6 MW |
| Battery storage 46.2 MW grid connection at Bowesfield Crescent BESS | England, United Kingdom | Grid operator | 46.2 MW |
| Solar 45 MW grid connection at Morrow Edge Solar | England, United Kingdom | Grid operator | 45 MW |
| Solar 45 MW grid connection at Murton Solar Farm | England, United Kingdom | Grid operator | 45 MW |
| Solar 45 MW grid connection at North East Mason Farm PV Direct | England, United Kingdom | Grid operator | 45 MW |
| Battery storage and Solar 44.9 MW grid connection at Greenswell Hybrid | England, United Kingdom | Grid operator | 44.9 MW |
| Low Horton Farm grid connection | England, United Kingdom | Grid operator | 44 MW |
| Solar 42.75 MW grid connection at Bluestone Farm PV | England, United Kingdom | Grid operator | 42.8 MW |
| Burnt House Farm grid connection | England, United Kingdom | Grid operator | 42.2 MW |
| Solar 42 MW grid connection at Sheraton Solar | England, United Kingdom | Grid operator | 42 MW |
| Solar 41.8 MW grid connection at Moor Leaze Solar Direct | England, United Kingdom | Grid operator | 41.8 MW |
| Blyth Offshore Windfarm grid connection | England, United Kingdom | Grid operator | 41.5 MW |
| West House Farm grid connection | England, United Kingdom | Grid operator | 41.1 MW |
| Solar 41.04 MW grid connection at Fylands Bridge PV | England, United Kingdom | Grid operator | 41 MW |
| Solar 41 MW grid connection at Meadowfield Solar Direct | England, United Kingdom | Grid operator | 41 MW |
| Battery storage and Solar 40 MW grid connection at Institute Street | England, United Kingdom | Grid operator | 40 MW |
| Burnt House Farm grid connection | England, United Kingdom | Grid operator | 40 MW |
| Gas 40 MW grid connection at Peterlee Industrial | England, United Kingdom | Grid operator | 40 MW |
| Low Horton Farm grid connection | England, United Kingdom | Grid operator | 40 MW |
| Solar 40 MW grid connection at Deerholme Farm Solar | England, United Kingdom | Grid operator | 40 MW |
| Solar 40 MW grid connection at Shirbutt Lane PV | England, United Kingdom | Grid operator | 40 MW |
| Solar 40 MW grid connection at Wath Lane Solar Farm | England, United Kingdom | Grid operator | 40 MW |
| Solar 40 MW grid connection at Whessoe PV | England, United Kingdom | Grid operator | 40 MW |
| Solar 39.6 MW grid connection at Guisborough Estate | England, United Kingdom | Grid operator | 39.6 MW |
| Land south of Skeeby Substation grid connection | England, United Kingdom | Grid operator | 39 MW |
| Solar 39 MW grid connection at Swan House PV | England, United Kingdom | Grid operator | 39 MW |
| Battery storage 38 MW grid connection at Hastings Hills BESS | England, United Kingdom | Grid operator | 38 MW |
| Solar 38 MW grid connection at Hurworth Moor Solar | England, United Kingdom | Grid operator | 38 MW |
| Battery storage 37.5 MW grid connection at Venus Park BESS | England, United Kingdom | Grid operator | 37.5 MW |
| Solar 37.5 MW grid connection at West Woodburn Farm PV | England, United Kingdom | Grid operator | 37.5 MW |
| Seaham Grange Farm grid connection | England, United Kingdom | Grid operator | 36 MW |
| Wind 36 MW grid connection at Fourstones 20kV Direct | England, United Kingdom | Grid operator | 36 MW |
| Port of Tyne BESS Extension grid connection | England, United Kingdom | Grid operator | 35.1 MW |
| Battery storage 35 MW grid connection at Poppleton Station BESS | England, United Kingdom | Grid operator | 35 MW |
| Port of Tyne BESS grid connection | England, United Kingdom | Grid operator | 35 MW |
| Solar 35 MW grid connection at Humbleton Farm PV | England, United Kingdom | Grid operator | 35 MW |
| Solar 35 MW grid connection at Poppleton Station Solar Farm | England, United Kingdom | Grid operator | 35 MW |
| Solar 32.6 MW grid connection at New Farm | England, United Kingdom | Grid operator | 32.6 MW |
| Biomass 31.666 MW grid connection at Cramlington Biomass | England, United Kingdom | Grid operator | 31.7 MW |
| Solar 31.4 MW grid connection at Blucher Solar | England, United Kingdom | Grid operator | 31.4 MW |
| Academy of Light PV grid connection | England, United Kingdom | Grid operator | 31 MW |
| Battery storage 30 MW grid connection at Foxcover Road BESS | England, United Kingdom | Grid operator | 30 MW |
| Battery storage 30 MW grid connection at West Sleekburn BESS | England, United Kingdom | Grid operator | 30 MW |
| Solar 30 MW grid connection at Stell Solar Farm | England, United Kingdom | Grid operator | 30 MW |
| Solar 30 MW grid connection at Village Farm Solar Direct | England, United Kingdom | Grid operator | 30 MW |
| Wind 30 MW grid connection at Haverigg Wind Farm | England, United Kingdom | Grid operator | 30 MW |
| Wind 29.925 MW grid connection at Lynemouth Windfarm Direct | England, United Kingdom | Grid operator | 29.9 MW |
| Solar 28.12 MW grid connection at Backworth | England, United Kingdom | Grid operator | 28.1 MW |
| Battery storage 28 MW grid connection at Guisborough BESS Direct | England, United Kingdom | Grid operator | 28 MW |
| Gas 27 MW grid connection at Boscar Grange Generation | England, United Kingdom | Grid operator | 27 MW |
| Solar 27 MW grid connection at Holmside Hall | England, United Kingdom | Grid operator | 27 MW |
| Battery storage and Solar 25.2 MW grid connection at West Moor Farm | England, United Kingdom | Grid operator | 25.2 MW |
| Solar 25 MW grid connection at David Anderson | England, United Kingdom | Grid operator | 25 MW |
| Solar 25 MW grid connection at Thornley Hall Farm | England, United Kingdom | Grid operator | 25 MW |
| Whelley Hill Farm grid connection | England, United Kingdom | Grid operator | 25 MW |
| Solar 24 MW grid connection at Fawcett PV | England, United Kingdom | Grid operator | 24 MW |
| Wind 23.75 MW grid connection at Stonefoot Windfarm | England, United Kingdom | Grid operator | 23.8 MW |
| Waste 23.7 MW grid connection at Allerton Waste | England, United Kingdom | Grid operator | 23.7 MW |
| Sita IBA Recycling Plant grid connection | England, United Kingdom | Grid operator | 23 MW |
| Solar 23 MW grid connection at Darlington East | England, United Kingdom | Grid operator | 23 MW |
| Solar 23 MW grid connection at Seamer Moor PV | England, United Kingdom | Grid operator | 23 MW |
| Solar 22.99 MW grid connection at Whinfield House PV | England, United Kingdom | Grid operator | 23 MW |
| Solar 22.5 MW grid connection at Turnstall Solar Farm | England, United Kingdom | Grid operator | 22.5 MW |
| Growhow UK Ltd (Billingham) grid connection | England, United Kingdom | Grid operator | 21.9 MW |
| Solar 21.07 MW grid connection at Newcastle Airport | England, United Kingdom | Grid operator | 21.1 MW |
| Wind 20.5 MW grid connection at Wandylaw Windfarm | England, United Kingdom | Grid operator | 20.5 MW |
| Sita IBA Recycling Plant grid connection | England, United Kingdom | Grid operator | 20.1 MW |
| Battery storage 20 MW grid connection at Ray Fell Windfarm | England, United Kingdom | Grid operator | 20 MW |
| Court Green Farm grid connection | England, United Kingdom | Grid operator | 20 MW |
| Wind 20 MW grid connection at Fishburn | England, United Kingdom | Grid operator | 20 MW |
| Solar 19 MW grid connection at East Cowton Solar Farm | England, United Kingdom | Grid operator | 19 MW |
| Wind 18.5 MW grid connection at Widdrington Steads Windfarm | England, United Kingdom | Grid operator | 18.5 MW |
| Gas 17.6 MW grid connection at Wynyard | England, United Kingdom | Grid operator | 17.6 MW |
| Battery storage 17.5 MW grid connection at High Flatworth BESS | England, United Kingdom | Grid operator | 17.5 MW |
| Meadowfield Solar grid connection | England, United Kingdom | Grid operator | 16.9 MW |
| Battery storage and Solar 16 MW grid connection at Wormald Green 132/11kV Direct | England, United Kingdom | Grid operator | 16 MW |
| Knapton Hybrid grid connection | England, United Kingdom | Grid operator | 16 MW |
| Biomass 15.794 MW grid connection at Chilton Generation | England, United Kingdom | Grid operator | 15.8 MW |
| Wind 15.2 MW grid connection at Knabs Ridge | England, United Kingdom | Grid operator | 15.2 MW |
| Wind 15 MW grid connection at Morpeth | England, United Kingdom | Grid operator | 15 MW |
| Solar 13.8 MW grid connection at Nissan | England, United Kingdom | Grid operator | 13.8 MW |
| Wind 13.8 MW grid connection at Consett | England, United Kingdom | Grid operator | 13.8 MW |
| Wind 13.4 MW grid connection at Wynyard | England, United Kingdom | Grid operator | 13.4 MW |
| Northumbrian Water Ltd grid connection | England, United Kingdom | Grid operator | 13.2 MW |
| Solar 12.75 MW grid connection at Harmire Bridge | England, United Kingdom | Grid operator | 12.8 MW |
| Battery storage and Solar 12.5 MW grid connection at Elvington | England, United Kingdom | Grid operator | 12.5 MW |
| Gas 12.5 MW grid connection at Leeming RAF | England, United Kingdom | Grid operator | 12.5 MW |
| Wind 12.5 MW grid connection at Wynyard | England, United Kingdom | Grid operator | 12.5 MW |
| Wind 12.3 MW grid connection at Moor House Windfarm | England, United Kingdom | Grid operator | 12.3 MW |
| Gas 12 MW grid connection at Grangetown | England, United Kingdom | Grid operator | 12 MW |
| Gas 12 MW grid connection at University | England, United Kingdom | Grid operator | 12 MW |
| Whelley Hill Farm Charging 2 grid connection | England, United Kingdom | Grid operator | 12 MW |
| Gas 10.925 MW grid connection at University | England, United Kingdom | Grid operator | 10.9 MW |
| Wind 10.26 MW grid connection at Seamer Wind Farm | England, United Kingdom | Grid operator | 10.3 MW |
| Sita IBA Recycling Plant grid connection | England, United Kingdom | Grid operator | 10 MW |
| Waste 10 MW grid connection at Billingham Energy Waste | England, United Kingdom | Grid operator | 10 MW |
| Wind 10 MW grid connection at Peterlee West | England, United Kingdom | Grid operator | 10 MW |
| Nestle UK Ltd (Haxby Road) grid connection | England, United Kingdom | Grid operator | 9.98 MW |
| Solar 9.25 MW grid connection at Northallerton | England, United Kingdom | Grid operator | 9.25 MW |
| Solar 8.58 MW grid connection at Norton 132/11kV Direct | England, United Kingdom | Grid operator | 8.58 MW |
| Wind 8.2 MW grid connection at Widdrington Church Windfarm | England, United Kingdom | Grid operator | 8.2 MW |
| Solar 8 MW grid connection at Stoney Cut | England, United Kingdom | Grid operator | 8 MW |
| Wind 7.79 MW grid connection at Norton 132/11kV Direct | England, United Kingdom | Grid operator | 7.79 MW |
| Wind 7.79 MW grid connection at Stoney Cut | England, United Kingdom | Grid operator | 7.79 MW |
| Wind 7.6 MW grid connection at Meadowfield | England, United Kingdom | Grid operator | 7.6 MW |
| Wind 7.6 MW grid connection at Potter House T1 T3 | England, United Kingdom | Grid operator | 7.6 MW |
| Gas 6.745 MW grid connection at Greatham Direct | England, United Kingdom | Grid operator | 6.75 MW |
| Battery storage 6.555 MW grid connection at Gateshead East | England, United Kingdom | Grid operator | 6.56 MW |
| Battery storage 6 MW grid connection at Gateshead East | England, United Kingdom | Grid operator | 6 MW |
| Cleveland Potash Ltd BESS grid connection | England, United Kingdom | Grid operator | 6 MW |
| Gas 6 MW grid connection at Howdon | England, United Kingdom | Grid operator | 6 MW |
| Gas 6 MW grid connection at Sunderland T1 T2 | England, United Kingdom | Grid operator | 6 MW |
| Hydro 6 MW grid connection at Kielder Hydro | England, United Kingdom | Grid operator | 6 MW |
| Nissan Car Plant grid connection | England, United Kingdom | Grid operator | 6 MW |
| Oil 6 MW grid connection at North Tees T3 T4 | England, United Kingdom | Grid operator | 6 MW |
| Oil 6 MW grid connection at Prissick | England, United Kingdom | Grid operator | 6 MW |
| Solar 6 MW grid connection at Wynyard | England, United Kingdom | Grid operator | 6 MW |
| Wind 6 MW grid connection at Hawthorn Pit | England, United Kingdom | Grid operator | 6 MW |
| Wind 5.89 MW grid connection at Consett | England, United Kingdom | Grid operator | 5.89 MW |
| Gas 5.7 MW grid connection at Killingworth | England, United Kingdom | Grid operator | 5.7 MW |
| Waste 5.7 MW grid connection at Howdon | England, United Kingdom | Grid operator | 5.7 MW |
| Waste 5.51 MW grid connection at Husthwaite 33/11kV | England, United Kingdom | Grid operator | 5.51 MW |
| Gas 5.463 MW grid connection at Longbenton | England, United Kingdom | Grid operator | 5.46 MW |
| Solar 5.415 MW grid connection at Billingham Marsh House | England, United Kingdom | Grid operator | 5.42 MW |
| Solar 5.415 MW grid connection at Billingham Marsh House | England, United Kingdom | Grid operator | 5.42 MW |
| Solar 5.415 MW grid connection at Norton 132/11kV Direct | England, United Kingdom | Grid operator | 5.42 MW |
| Solar 5.39 MW grid connection at Belmont | England, United Kingdom | Grid operator | 5.39 MW |
| Wind 5.25 MW grid connection at Hartmoor 66/20kV | England, United Kingdom | Grid operator | 5.25 MW |
| Waste 5.225 MW grid connection at Blaydon Burn | England, United Kingdom | Grid operator | 5.23 MW |
| Waste 5.1 MW grid connection at Greatham Direct | England, United Kingdom | Grid operator | 5.1 MW |
| Waste 5.1 MW grid connection at Spencerbeck | England, United Kingdom | Grid operator | 5.1 MW |
| Nissan Car Plant grid connection | England, United Kingdom | Grid operator | 5 MW |
| Oil 5 MW grid connection at Huntington New Lane | England, United Kingdom | Grid operator | 5 MW |
| Solar 5 MW grid connection at Darlington East | England, United Kingdom | Grid operator | 5 MW |
| Solar 5 MW grid connection at Peterlee Industrial | England, United Kingdom | Grid operator | 5 MW |
| Solar 5 MW grid connection at Thirsk | England, United Kingdom | Grid operator | 5 MW |
| Tees Valley Energy Recovery grid connection | England, United Kingdom | Grid operator | 5 MW |
| Wind 4.94 MW grid connection at Brancepeth | England, United Kingdom | Grid operator | 4.94 MW |
| Wind 4.94 MW grid connection at Fishburn | England, United Kingdom | Grid operator | 4.94 MW |
| Waste 4.921 MW grid connection at Faraday Street | England, United Kingdom | Grid operator | 4.92 MW |
| Solar 4.9 MW grid connection at Brancepeth | England, United Kingdom | Grid operator | 4.9 MW |
| Solar 4.8 MW grid connection at Husthwaite 33/11kV | England, United Kingdom | Grid operator | 4.8 MW |
| Augean PLC grid connection | England, United Kingdom | Grid operator | 4.75 MW |
| Gas 4.7 MW grid connection at Stokesley | England, United Kingdom | Grid operator | 4.7 MW |
| Hydro Polymers grid connection | England, United Kingdom | Grid operator | 4.66 MW |
| Scarborough Hospital, Woodlands Drive, Scarborough Cancelled grid connection | England, United Kingdom | Grid operator | 4.57 MW |
| East Appleton Farm grid connection | England, United Kingdom | Grid operator | 4.5 MW |
| East Appleton Farm grid connection | England, United Kingdom | Grid operator | 4.5 MW |
| Wind 4.5 MW grid connection at Hedworth | England, United Kingdom | Grid operator | 4.5 MW |
| Generation 4.4 MW grid connection at Tees Industrial T3 T4 | England, United Kingdom | Grid operator | 4.4 MW |
| Oil 4.3 MW grid connection at North Bank Direct | England, United Kingdom | Grid operator | 4.3 MW |
| Solar 4.2 MW grid connection at Usworth | England, United Kingdom | Grid operator | 4.2 MW |
| Solar 4.15 MW grid connection at Annfield 66/20kV | England, United Kingdom | Grid operator | 4.15 MW |
| Battery storage 4 MW grid connection at Whitby T2 | England, United Kingdom | Grid operator | 4 MW |
| Gas 4 MW grid connection at Bedale | England, United Kingdom | Grid operator | 4 MW |
| Gas 4 MW grid connection at Peterlee Industrial | England, United Kingdom | Grid operator | 4 MW |
| Gas 4 MW grid connection at Tees Industrial T1 T2 | England, United Kingdom | Grid operator | 4 MW |
| Solar 3.99 MW grid connection at Sheriff Hutton | England, United Kingdom | Grid operator | 3.99 MW |
| Wind 3.99 MW grid connection at West Hartford | England, United Kingdom | Grid operator | 3.99 MW |
| Waste 3.943 MW grid connection at Seghill | England, United Kingdom | Grid operator | 3.94 MW |
| Newcastle University Agriculture Buildings grid connection | England, United Kingdom | Grid operator | 3.81 MW |
| Blyth Offshore Windfarm Add grid connection | England, United Kingdom | Grid operator | 3.8 MW |
| Solar 3.8 MW grid connection at Guisborough T1 T2 | England, United Kingdom | Grid operator | 3.8 MW |
| Wind 3.8 MW grid connection at Peterlee West | England, United Kingdom | Grid operator | 3.8 MW |
| School Aycliffe Solar Park grid connection | England, United Kingdom | Grid operator | 3.75 MW |
| Solar 3.7 MW grid connection at Urlay Nook | England, United Kingdom | Grid operator | 3.7 MW |
| Hydro Polymers grid connection | England, United Kingdom | Grid operator | 3.65 MW |
| Waste 3.61 MW grid connection at Coneythorpe | England, United Kingdom | Grid operator | 3.61 MW |
| Solar 3.563 MW grid connection at Sessay Bridge/Sowerby | England, United Kingdom | Grid operator | 3.56 MW |
| Solar 3.503 MW grid connection at Annfield 66/20kV | England, United Kingdom | Grid operator | 3.5 MW |
| Wind 3.5 MW grid connection at Annfield 66/20kV | England, United Kingdom | Grid operator | 3.5 MW |
| Wind 3.5 MW grid connection at Hawthorn Pit | England, United Kingdom | Grid operator | 3.5 MW |
| Solar 3.44 MW grid connection at Nissan North | England, United Kingdom | Grid operator | 3.44 MW |
| Generation 3.42 MW grid connection at Birtley Grove 66/20kV | England, United Kingdom | Grid operator | 3.42 MW |
| Broken Scar Treatment Works grid connection | England, United Kingdom | Grid operator | 3.4 MW |
| Wind 3.325 MW grid connection at Gale Lane | England, United Kingdom | Grid operator | 3.33 MW |
| Wind 3.24 MW grid connection at Ashington | England, United Kingdom | Grid operator | 3.24 MW |
| University of York, Heslington East Campus grid connection | England, United Kingdom | Grid operator | 3.12 MW |
| Broken Scar Treatment Works grid connection | England, United Kingdom | Grid operator | 3.1 MW |
| Alne Materials Recycling Facility grid connection | England, United Kingdom | Grid operator | 3 MW |
| Gas 3 MW grid connection at Lucite | England, United Kingdom | Grid operator | 3 MW |
| Solar 3 MW grid connection at Simonside | England, United Kingdom | Grid operator | 3 MW |
| Solar 3 MW grid connection at Stoney Cut | England, United Kingdom | Grid operator | 3 MW |
| Solar 2.86 MW grid connection at Hedworth | England, United Kingdom | Grid operator | 2.86 MW |
| Battery storage 2.85 MW grid connection at Birtley Grove 66/11kV | England, United Kingdom | Grid operator | 2.85 MW |
| Battery storage 2.85 MW grid connection at Birtley Grove 66/20kV | England, United Kingdom | Grid operator | 2.85 MW |
| Battery storage 2.85 MW grid connection at Eastfield | England, United Kingdom | Grid operator | 2.85 MW |
| Gas 2.85 MW grid connection at Blaydon Burn | England, United Kingdom | Grid operator | 2.85 MW |
| Wind 2.85 MW grid connection at Brancepeth | England, United Kingdom | Grid operator | 2.85 MW |
| Wind 2.85 MW grid connection at Brancepeth | England, United Kingdom | Grid operator | 2.85 MW |
| Solar 2.845 MW grid connection at Denwick | England, United Kingdom | Grid operator | 2.85 MW |
| Battery storage and Gas 2.8 MW grid connection at Denwick | England, United Kingdom | Grid operator | 2.8 MW |
| Solar 2.66 MW grid connection at Elvington | England, United Kingdom | Grid operator | 2.66 MW |
| Newcastle Airport grid connection | England, United Kingdom | Grid operator | 2.6 MW |
| Biomass 2.5 MW grid connection at Hexham | England, United Kingdom | Grid operator | 2.5 MW |
| Gas 2.5 MW grid connection at Darlington East | England, United Kingdom | Grid operator | 2.5 MW |
| Gas 2.5 MW grid connection at Darlington West | England, United Kingdom | Grid operator | 2.5 MW |
| Gas 2.5 MW grid connection at Malton | England, United Kingdom | Grid operator | 2.5 MW |
| Gas 2.5 MW grid connection at Norton 132/11kV Direct | England, United Kingdom | Grid operator | 2.5 MW |
| Solar 2.5 MW grid connection at Seghill | England, United Kingdom | Grid operator | 2.5 MW |
| Wind 2.47 MW grid connection at Hawthorn Pit | England, United Kingdom | Grid operator | 2.47 MW |
| Generation 2.451 MW grid connection at Billy Mill | England, United Kingdom | Grid operator | 2.45 MW |
| Wind 2.299 MW grid connection at Lynemouth | England, United Kingdom | Grid operator | 2.3 MW |
| Waste 2.28 MW grid connection at Heighington | England, United Kingdom | Grid operator | 2.28 MW |
| Waste 2.2 MW grid connection at Fawdon/Seaton Burn | England, United Kingdom | Grid operator | 2.2 MW |
| Waste 2.185 MW grid connection at North Tees T3 T4 | England, United Kingdom | Grid operator | 2.19 MW |
| Solar 2.1 MW grid connection at Annfield 66/20kV | England, United Kingdom | Grid operator | 2.1 MW |
| Solar 2.09 MW grid connection at Pallion Trading | England, United Kingdom | Grid operator | 2.09 MW |
| Waste 2.09 MW grid connection at Blaydon Burn | England, United Kingdom | Grid operator | 2.09 MW |
| Landfill gas 2.027 MW grid connection at Grangetown | England, United Kingdom | Grid operator | 2.03 MW |
| Alne Materials Recycling Facility grid connection | England, United Kingdom | Grid operator | 2 MW |
| Gas 2 MW grid connection at Stokesley | England, United Kingdom | Grid operator | 2 MW |
| Generation 2 MW grid connection at Durham Rail Direct | England, United Kingdom | Grid operator | 2 MW |
| Generation 2 MW grid connection at Linton 66/20kV | England, United Kingdom | Grid operator | 2 MW |
| Hartlepool University Hospital grid connection | England, United Kingdom | Grid operator | 2 MW |
| Waste 2 MW grid connection at Fishburn | England, United Kingdom | Grid operator | 2 MW |
| Waste 2 MW grid connection at Husthwaite 33/11kV | England, United Kingdom | Grid operator | 2 MW |
| York University 10MVA Demand 2MW CHP grid connection | England, United Kingdom | Grid operator | 2 MW |
| Gas 1.995 MW grid connection at Houghton | England, United Kingdom | Grid operator | 2 MW |
| Gas 1.9 MW grid connection at Offerton 33/11kV | England, United Kingdom | Grid operator | 1.9 MW |
| Generation 1.9 MW grid connection at Toronto 66/20kV | England, United Kingdom | Grid operator | 1.9 MW |
| Waste 1.9 MW grid connection at Houghton | England, United Kingdom | Grid operator | 1.9 MW |
| Yorwaste Ltd grid connection | England, United Kingdom | Grid operator | 1.9 MW |
| Harrogate District Hospital grid connection | England, United Kingdom | Grid operator | 1.75 MW |
| North Tees Health NHS Trust grid connection | England, United Kingdom | Grid operator | 1.72 MW |
| Solar 1.7 MW grid connection at Spennymoor 66/20kV | England, United Kingdom | Grid operator | 1.7 MW |
| Oil 1.65 MW grid connection at Ashington | England, United Kingdom | Grid operator | 1.65 MW |
| Solar 1.62 MW grid connection at Redcar | England, United Kingdom | Grid operator | 1.62 MW |
| Solar 1.6 MW grid connection at Houghton | England, United Kingdom | Grid operator | 1.6 MW |
| Gas 1.56 MW grid connection at North Tees T1 T2 | England, United Kingdom | Grid operator | 1.56 MW |
| Kirkheaton Wind Ltd grid connection | England, United Kingdom | Grid operator | 1.52 MW |
| Solar 1.52 MW grid connection at Prissick | England, United Kingdom | Grid operator | 1.52 MW |
| Gas 1.5 MW grid connection at Mount Road | England, United Kingdom | Grid operator | 1.5 MW |
| Waste 1.5 MW grid connection at Scarborough 33/11kV | England, United Kingdom | Grid operator | 1.5 MW |
| Water Road grid connection | England, United Kingdom | Grid operator | 1.5 MW |
| Wind 1.5 MW grid connection at Carlin How T3 T4 | England, United Kingdom | Grid operator | 1.5 MW |
| Hartlepool University Hospital Phase 2 PV grid connection | England, United Kingdom | Grid operator | 1.49 MW |
| Solar 1.484 MW grid connection at Mount Road | England, United Kingdom | Grid operator | 1.48 MW |
| Solar 1.45 MW grid connection at Usworth | England, United Kingdom | Grid operator | 1.45 MW |
| Gas 1.425 MW grid connection at Starbeck | England, United Kingdom | Grid operator | 1.43 MW |
| Generation 1.425 MW grid connection at Harmire Bridge | England, United Kingdom | Grid operator | 1.43 MW |
| Waste 1.425 MW grid connection at Bedale | England, United Kingdom | Grid operator | 1.43 MW |
| Waste 1.425 MW grid connection at Coneythorpe | England, United Kingdom | Grid operator | 1.43 MW |
| Solar 1.407 MW grid connection at Cramlington T1 T3 | England, United Kingdom | Grid operator | 1.41 MW |
| Oil 1.36 MW grid connection at Fourstones 20kV Direct | England, United Kingdom | Grid operator | 1.36 MW |
| Solar 1.325 MW grid connection at Potter House T4 T5 | England, United Kingdom | Grid operator | 1.33 MW |
| Waste 1.31 MW grid connection at Ashington | England, United Kingdom | Grid operator | 1.31 MW |
| Solar 1.26 MW grid connection at North Tees T3 T4 | England, United Kingdom | Grid operator | 1.26 MW |
| Battery storage 1.25 MW grid connection at Hartmoor 66/20kV | England, United Kingdom | Grid operator | 1.25 MW |
| Gas 1.25 MW grid connection at York University | England, United Kingdom | Grid operator | 1.25 MW |
| Gas 1.2 MW grid connection at Mount Road | England, United Kingdom | Grid operator | 1.2 MW |
| Generation 1.188 MW grid connection at Skerneside | England, United Kingdom | Grid operator | 1.19 MW |
| Gas 1.161 MW grid connection at Foss Islands | England, United Kingdom | Grid operator | 1.16 MW |
| Solar 1.15 MW grid connection at Mount Road | England, United Kingdom | Grid operator | 1.15 MW |
| Highfield Farm grid connection | England, United Kingdom | Grid operator | 1.13 MW |
| Waste 1.097 MW grid connection at Grangetown | England, United Kingdom | Grid operator | 1.1 MW |
| Solar 1.043 MW grid connection at Benwell | England, United Kingdom | Grid operator | 1.04 MW |
| Coal Authority Hybrid grid connection | England, United Kingdom | Grid operator | 1.04 MW |
| Solar 1.004 MW grid connection at Offerton 33/11kV | England, United Kingdom | Grid operator | 1 MW |
| Biomass 1 MW grid connection at Consett | England, United Kingdom | Grid operator | 1 MW |
| Landfill gas 1 MW grid connection at Ashington | England, United Kingdom | Grid operator | 1 MW |
| NHS Diagnostic Centre Diesel grid connection | England, United Kingdom | Grid operator | 1 MW |
| Solar 1 MW grid connection at Peterlee Industrial | England, United Kingdom | Grid operator | 1 MW |
| Solar 1 MW grid connection at Usworth | England, United Kingdom | Grid operator | 1 MW |
| Whitley Bay High School PV grid connection | England, United Kingdom | Grid operator | 1 MW |
| Wind 1 MW grid connection at Annfield 66/20kV | England, United Kingdom | Grid operator | 1 MW |