Battery storage and Solar 80 MW grid connection at Fourstones Hybrid

Battery storage and Solar 80 MW grid connection at Fourstones Hybrid is a planned grid connection in England, United Kingdom, with 80 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Fourstones Hybrid)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity80 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date9 Jun 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates55.0195, -2.1459Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Battery storage and Solar 80 MW grid connection at Fourstones Hybrid is the 411th-largest of 2,533 grid connections in England and the 538th-largest of 3,903 in the United Kingdom by capacity; its 80 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England411th of 2,533319,370 MW<0.1%
United Kingdom538th of 3,903446,745 MW<0.1%
All grid connections in our data3,511th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 157 power plants (50 operating, 852 MW), 117 substations, 1 data center and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Park ShieldPower plant1 MWCancelled1.1 km
Fourstones Substation, Fourstones - Solar Farm & Battery Energy StoragePower plant32 MWPlanned1.2 km
Fourstones 20kVSubstation——1.5 km
Fourstones 33kVSubstation——1.5 km
Halfway House, Lincoln Hill - Energy StoragePower plant2.5 MWPermitted1.9 km
HexhamSubstation——5.8 km
Stellium Newcastle CampusData center——41 km
Cross Border Connection (England)Transmission line—Planned43 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom