Substation · England, United Kingdom
Lackenby
Lackenby is a substation in England, United Kingdom, connected by Northern Powergrid (Northeast) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Northeast) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (offtake) | None (rag: Green) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | None (rag: Green) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Demand headroom | 102 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Generation headroom | 236 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Firm capacity | 260 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Level | Gsp | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 66 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 54.5677, -1.1325 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 226 grid connections (114 operating, 1,181 MW), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 250 MW grid connection at Old Hill Farm Direct | Grid connection | 250 MW | Planned | 0.4 km |
| Gas 12 MW grid connection at Grangetown | Grid connection | 12 MW | Operating | 1.8 km |
| Landfill gas 2.027 MW grid connection at Grangetown | Grid connection | 2.03 MW | Operating | 1.9 km |
Grid operator and place
Upstream substation
Grid connections attached to this substation
- Court Green Farm grid connection125 MW
- Court Green Farm grid connection20 MW
- Battery storage 28 MW grid connection at Guisborough BESS Direct28 MW
- Solar 39.6 MW grid connection at Guisborough Estate39.6 MW
- Teesside Windfarm Ltd grid connection62 MW
- Cleveland Potash Ltd BESS grid connection6 MW
- Northumbrian Water Ltd grid connection13.2 MW
- Battery storage 250 MW grid connection at Old Hill Farm Direct250 MW
- Battery storage and Solar 100 MW grid connection at Thrushwood Farm BESS100 MW
More from Northern Powergrid (Northeast) plc
- Annfieldsubstation
- Barrack Roadsubstation
- Bluchersubstation
- Bowesfieldsubstation
- Chirton Grangesubstation
- Coalburnssubstation
- Darlington Centralsubstation
- Darlington Northsubstation
Other substations in England
Data on this page
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.