Grid connection · England, United Kingdom

Battery storage 60 MW grid connection at Wheatlands BESS

Battery storage 60 MW grid connection at Wheatlands BESS is a planned grid connection in England, United Kingdom, with 60 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Wheatlands BESS)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toPoppleton (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity60 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date26 Feb 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.9733, -1.1412Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Battery storage 60 MW grid connection at Wheatlands BESS is the 488th-largest of 2,533 grid connections in England and the 672nd-largest of 3,903 in the United Kingdom by capacity; its 60 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England488th of 2,533319,370 MW<0.1%
United Kingdom672nd of 3,903446,745 MW<0.1%
All grid connections in our data3,824th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 329 power plants (86 operating, 3,693 MW), 241 substations, 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
PoppletonSubstation——0.6 km
Severus HillSubstation——2.1 km
Rawcliffe LaneSubstation——2.4 km
Harewood Whin Landfill SitePower plant2.4 MWOperating2.5 km
Harewood Whin, Tinker Lane - Solar FarmPower plant28 MWPermitted2.8 km
Hessay Solar FarmPower plant40 MWPermitted3.5 km
Yorkshire GREENTransmission line—Permitted12 km
VocaLinkData center——28 km
HSBC Wakefield Data CentreData center——34 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom