Grid connection · England, United Kingdom

Gas 50 MW grid connection at Phillips Petroleum

Gas 50 MW grid connection at Phillips Petroleum is a planned grid connection in England, United Kingdom, with 50 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Phillips Petroleum)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSeal Sands (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity50 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date4 Jul 2025Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.6180, -1.1691Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Gas 50 MW grid connection at Phillips Petroleum is the 538th-largest of 2,533 grid connections in England and the 804th-largest of 3,903 in the United Kingdom by capacity; its 50 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England538th of 2,533319,370 MW<0.1%
United Kingdom804th of 3,903446,745 MW<0.1%
All grid connections in our data4,076th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 248 power plants (79 operating, 715 MW), 141 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Seal SandsPower plant24 MWCancelled0.6 km
Cowpen Bewley, Seal Sands Link Road - Battery Energy StoragePower plant200 MWPlanned0.9 km
Tees Industrial T1 T2Substation——1.1 km
Lighthouse Green Fuels ProjectPower plant200 MWPlanned1.4 km
Seal SandsSubstation——2.4 km
Greatham DirectSubstation——2.7 km
Lumen Technologies data center, MiddlesbroughData center——6.1 km
DXC Wynyard Data CenterData center——9.2 km
Data center, Redcar (OSM way 1055031579)Data center——9.3 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page