Grid connection · England, United Kingdom

Solar 99.75 MW grid connection at Low Moor Lane Direct

Solar 99.75 MW grid connection at Low Moor Lane Direct is a planned grid connection in England, United Kingdom, with 99.8 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Low Moor Lane Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toKnaresborough (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity99.8 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date8 Sept 2020Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.0379, -1.4880Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Solar 99.75 MW grid connection at Low Moor Lane Direct is the 363rd-largest of 2,533 grid connections in England and the 472nd-largest of 3,903 in the United Kingdom by capacity; its 99.8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England363rd of 2,533319,370 MW<0.1%
United Kingdom472nd of 3,903446,745 MW<0.1%
All grid connections in our data3,071st of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 252 substations, 242 power plants (58 operating, 3,474 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
KnaresboroughSubstation——0.7 km
Low Moor Lane, Scotton - Battery Energy Storage SystemPower plant200 MWPlanned0.9 km
Wormald Green Solar FarmPower plant43 MWPermitted3.7 km
Station Lane, South StainleyPower plant10 MWPermitted4.0 km
StarbeckSubstation——4.6 km
Wormald Green 132/11kV DirectSubstation——4.7 km
Yorkshire GREENTransmission line—Permitted21 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom