Substation · England, United Kingdom

Tynemouth

Tynemouth is a substation in England, United Kingdom, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)None (rag: Green)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)None (rag: Green)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom68.9 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom162 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity260 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelGspNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates55.0247, -1.4993Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 227 grid connections (113 operating, 1,443 MW), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Battery storage 37.5 MW grid connection at Venus Park BESSGrid connection37.5 MWPlanned2.1 km
Generation 2.451 MW grid connection at Billy MillGrid connection2.45 MWOperating2.2 km
Battery storage 17.5 MW grid connection at High Flatworth BESSGrid connection17.5 MWOperating2.3 km

Grid operator and place

Upstream substation

Grid connections attached to this substation

More from Northern Powergrid (Northeast) plc

Other substations in England

All 1215 substations in England, United Kingdom

Data on this page