Grid connection · England, United Kingdom

Battery storage and Solar 71.3 MW grid connection at Carr House

Battery storage and Solar 71.3 MW grid connection at Carr House is a planned grid connection in England, United Kingdom, with 71.3 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Carr House)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toMalton Grid (via: bsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity71.3 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date20 Apr 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.1908, -0.5783Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage and Solar 71.3 MW grid connection at Carr House is the 443rd-largest of 2,533 grid connections in England and the 594th-largest of 3,903 in the United Kingdom by capacity; its 71.3 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England443rd of 2,533319,370 MW<0.1%
United Kingdom594th of 3,903446,745 MW<0.1%
All grid connections in our data3,411th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 120 power plants (30 operating, 483 MW), 64 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Carr House Farm, East Heslerton - Solar FarmPower plant23.5 MWPermitted1.9 km
YedinghamSubstation——3.0 km
KingspanPower plant10 MWCancelled3.7 km
SherburnPower plant5 MWOperating3.9 km
ButterwickSubstation——8.8 km
Thornton DaleSubstation——12 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned24 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled45 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page