Grid connection · England, United Kingdom

Battery storage 175 MW grid connection at West Boldon Farm BESS Direct

Battery storage 175 MW grid connection at West Boldon Farm BESS Direct is a planned grid connection in England, United Kingdom, with 175 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at West Boldon Farm BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toWest Boldon (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity175 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date22 Aug 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.9360, -1.4705Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Battery storage 175 MW grid connection at West Boldon Farm BESS Direct is the 255th-largest of 2,533 grid connections in England and the 340th-largest of 3,903 in the United Kingdom by capacity; its 175 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England255th of 2,533319,370 MW<0.1%
United Kingdom340th of 3,903446,745 MW<0.1%
All grid connections in our data2,281st of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 295 power plants (98 operating, 3,219 MW), 161 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
West BoldonSubstation——0.5 km
West Boldon Substation - Battery Energy StoragePower plant60 MWPermitted0.6 km
Snop UK, Washington Road - Solar PanelsPower plant1.15 MWPermitted1.2 km
Boldon DownhillSubstation——1.2 km
Nissan Test TrackPower plant4.8 MWOperating1.6 km
HedworthSubstation——2.8 km
Stellium Newcastle CampusData center——9.3 km
DXC Wynyard Data CenterData center——35 km
Lumen Technologies data center, MiddlesbroughData center——43 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom