Substation · England, United Kingdom

Eastfield

Eastfield is an 11 kV primary substation in England, United Kingdom, with 2.64 MVA of demand headroom and 32.4 MW of generation headroom, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom2.64 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom32.4 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity26 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimary substationNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromOsbaldwickNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromScarborough GridNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)Full (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.2370, -0.3995Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 76 power plants (20 operating, 337 MW), 70 grid connections (38 operating, 700 MW) and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Waste 1.5 MW grid connection at Scarborough 33/11kVGrid connection1.5 MWOperating0.8 km
Seamer CarrPower plant1.3 MWOperating1.4 km
Battery storage 2.85 MW grid connection at EastfieldGrid connection2.85 MWOperating1.5 km
Eastgate House Farm, Seamer - Solar FarmPower plant32 MWUnder construction2.0 km
Solar 23 MW grid connection at Seamer Moor PVGrid connection23 MWPlanned2.6 km
Queen Margarets Industrial EstatePower plant18 MWCancelled3.3 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned16 km
Eastern Green Link 5Transmission line—Planned45 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled48 km

Grid operator and place

Grid connections attached to this substation

More from Northern Powergrid (Northeast) plc

Candidate sites around this substation

8 sites of land near Eastfield have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 1666 substations in England, United Kingdom

Data on this page