Grid connection · England, United Kingdom
Landfill gas 2.027 MW grid connection at Grangetown
Landfill gas 2.027 MW grid connection at Grangetown is a grid connection in England, United Kingdom, with 2.03 MW of capacity, connected by Northern Powergrid (Northeast) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connection site: Grangetown) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Operating (Connected) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Grangetown (via: primary) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 2.03 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Landfill gas | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Northeast) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 17 May 2024 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Connection date | 15 Nov 2024 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 11 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 54.5827, -1.1464 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its grid operator? Ask us.
How it compares
Landfill gas 2.027 MW grid connection at Grangetown is the 2,161st-largest of 2,533 grid connections in England and the 3,337th-largest of 3,903 in the United Kingdom by capacity; its 2.03 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,161st of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,337th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,031st of 7,616 | 1,281,251 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Connected
Nearby
Within 50 km of this grid connection: 243 power plants (81 operating, 780 MW) and 123 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Grangetown | Substation | — | — | 0.2 km |
| Grangetown Prairie - Energy Recovery Facility, Option 1 | Power plant | 35.5 MW | Permitted | 0.4 km |
| ICI No2 (Teesport) Landfill | Power plant | 1 MW | Operating | 1.2 km |
| Tees CCPP | Power plant | 1,700 MW | Permitted | 1.5 km |
| Lackenby | Substation | — | — | 1.9 km |
| Spencerbeck | Substation | — | — | 3.0 km |
Grid operator and place
More from Northern Powergrid (Northeast) plc
- Biomass 399 MW grid connection at Lynemouth Power Direct399 MW
- Battery storage and Solar 320.3 MW grid connection at Colliery Farm SPV & BESS Direct320 MW
- Battery storage 250 MW grid connection at Old Hill Farm Direct250 MW
- Battery storage and Solar 200 MW grid connection at Clock and Grimeston Farm Direct200 MW
- Solar 200 MW grid connection at Scampston Solar Direct200 MW
- Solar 180 MW grid connection at Mill Lane Direct180 MW
- Mill Lane Solar PV grid connection180 MW
- Battery storage 175 MW grid connection at West Boldon Farm BESS Direct175 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- CAISO queue report. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, No restriction on the posted data.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.