Substation · England, United Kingdom
Fourstones 33kV
Fourstones 33kV is a substation in England, United Kingdom, connected by Northern Powergrid (Northeast) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Northeast) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Demand headroom | 51 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Firm capacity | 60 MVA | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Level | Gsp | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (offtake) | None (rag: Green) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | None (rag: Green) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 55.0120, -2.1650 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 156 power plants (50 operating, 852 MW), 153 grid connections (75 operating, 966 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Park Shield | Power plant | 1 MW | Cancelled | 0.4 km |
| Fourstones Substation, Fourstones - Solar Farm & Battery Energy Storage | Power plant | 32 MW | Planned | 0.8 km |
| Battery storage and Solar 80 MW grid connection at Fourstones Hybrid | Grid connection | 80 MW | Planned | 1.5 km |
| Fourstones - Solar Park | Power plant | 49.9 MW | Planned | 2.0 km |
| Battery storage and Solar 112 MW grid connection at Carr Edge Farm BESS | Grid connection | 112 MW | Planned | 2.1 km |
| Biomass 2.5 MW grid connection at Hexham | Grid connection | 2.5 MW | Operating | 6.1 km |
| Cross Border Connection (England) | Transmission line | — | Planned | 42 km |
Grid operator and place
More from Northern Powergrid (Northeast) plc
- Annfieldsubstation
- Barrack Roadsubstation
- Bluchersubstation
- Bowesfieldsubstation
- Chirton Grangesubstation
- Coalburnssubstation
- Darlington Centralsubstation
- Darlington Northsubstation
Other substations in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.