Grid connection · England, United Kingdom

Nissan Car Plant grid connection

Nissan Car Plant grid connection is a grid connection in England, United Kingdom, with 5 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Nissan)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toNissan Test Track (matched by shared name+coordinates+technology+capacity, 0.47 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toWest Boldon (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity5 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.9258, -1.4613Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Nissan Test Track
  2. Permit granted: Nissan Test Track (planning authority Sunderland, reference 15/00942/FUL)
  3. Permit applied for: Nissan Test Track (planning authority Sunderland, reference 15/00942/FUL)

How it compares

Nissan Car Plant grid connection is the 1,667th-largest of 2,533 grid connections in England and the 2,582nd-largest of 3,903 in the United Kingdom by capacity; its 5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,667th of 2,533319,370 MW<0.1%
United Kingdom2,582nd of 3,903446,745 MW<0.1%
All grid connections in our data6,544th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 293 power plants (94 operating, 1,364 MW), 162 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Nissan Test TrackPower plant4.8 MWOperating0.5 km
Washington Road - Solar FarmPower plant20 MWPermitted0.5 km
Snop UK, Washington Road - Solar PanelsPower plant1.15 MWPermitted0.9 km
Boldon DownhillSubstation——1.5 km
West BoldonSubstation——1.7 km
UsworthSubstation——2.5 km
Stellium Newcastle CampusData center——11 km
DXC Wynyard Data CenterData center——34 km
Lumen Technologies data center, MiddlesbroughData center——41 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page