Grid connection · England, United Kingdom

Solar 1.62 MW grid connection at Redcar

Solar 1.62 MW grid connection at Redcar is a grid connection in England, United Kingdom, with 1.62 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Redcar)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusOperating (connected)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toRedcar (via a primary substation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1.62 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date24 Oct 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Connection date3 Nov 2025Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.5924, -1.0263Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Solar 1.62 MW grid connection at Redcar is the 2,269th-largest of 2,533 grid connections in England and the 3,520th-largest of 3,903 in the United Kingdom by capacity; its 1.62 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,269th of 2,533319,370 MW<0.1%
United Kingdom3,520th of 3,903446,745 MW<0.1%
All grid connections in our data7,218th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Connected

Nearby

Within 50 km of this grid connection: 215 power plants (66 operating, 616 MW), 100 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Yearby Village - Tees Solar FarmPower plant49.9 MWPermitted2.4 km
RedcarSubstation——2.5 km
WiltonPower plant6.6 MWCancelled3.7 km
Wilton Industrial, Plot 1C - Electrolytic Hydrogen FacilityPower plant60 MWPlanned4.9 km
Guisborough T1 T2Substation——5.9 km
LackenbySubstation——7.4 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned46 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page