Substation · England, United Kingdom

Ripon

Ripon is an 11 kV primary substation in England, United Kingdom, with 1.16 MVA of demand headroom and 0 MW of generation headroom, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom1.16 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom0 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity19 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimary substationNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromKnaresboroughNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromWormald Green 132/33kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)None (green on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Limited (amber on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.1331, -1.5213Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 225 grid connections (113 operating, 1,078 MW), 189 power plants (50 operating, 742 MW), 5 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
New Oaks, Station Road - Battery Energy Storage SystemPower plant50 MWPlanned1.7 km
Battery storage and Solar 75.5 MW grid connection at Leyton HybridGrid connection75.5 MWOperating4.9 km
Barugh FarmPower plant5 MWOperating5.1 km
Solar 24 MW grid connection at Fawcett PVGrid connection24 MWPlanned5.9 km
Wormald Green - Battery Energy Storage SystemPower plant33 MWOperating6.3 km
Battery storage and Solar 16 MW grid connection at Wormald Green 132/11kV DirectGrid connection16 MWPlanned6.5 km
VocaLinkData center——18 km
Yorkshire GREENTransmission line—Permitted30 km
GridJetData center——39 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Candidate sites around this substation

14 sites of land near Ripon have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

All sites in North Yorkshire

Other substations in England

All 1666 substations in England, United Kingdom