Battery storage 50.7 MW grid connection at Fylands Bridge BESS
Battery storage 50.7 MW grid connection at Fylands Bridge BESS is a planned grid connection in England, United Kingdom, with 50.7 MW of capacity, connected by Northern Powergrid (Northeast) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Fylands Bridge BESS) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Spennymoor 132/66kV (via a bulk supply point) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Capacity | 50.7 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Battery storage | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Northeast) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 6 Feb 2023 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 66 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 54.6432, -1.6802 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchHow it compares
Battery storage 50.7 MW grid connection at Fylands Bridge BESS is the 533rd-largest of 2,533 grid connections in England and the 785th-largest of 3,903 in the United Kingdom by capacity; its 50.7 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 533rd of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 785th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 4,048th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 278 power plants (86 operating, 764 MW), 161 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Fylands Bridge | Substation | — | — | 0.2 km |
| Royal Oak | Power plant | 6.5 MW | Cancelled | 3.0 km |
| Toronto Green Energy Park, Addison Road - Solar Farm | Power plant | 27 MW | Planned | 3.5 km |
| Toronto | Substation | — | — | 3.7 km |
| Toronto 66/20kV | Substation | — | — | 3.7 km |
| Addison Road | Power plant | 22 MW | Cancelled | 3.8 km |
| DXC Wynyard Data Center | Data center | — | — | 24 km |
| Pulsant data center, England | Data center | — | — | 26 km |
| Lumen Technologies data center, Middlesbrough | Data center | — | — | 30 km |
Grid operator and place
More from Northern Powergrid (Northeast) plc
- Biomass 399 MW grid connection at Lynemouth Power Direct399 MW
- Battery storage and Solar 320.3 MW grid connection at Colliery Farm SPV & BESS Direct320 MW
- Battery storage 250 MW grid connection at Old Hill Farm Direct250 MW
- Battery storage and Solar 200 MW grid connection at Clock and Grimeston Farm Direct200 MW
- Solar 200 MW grid connection at Scampston Solar Direct200 MW
- Solar 180 MW grid connection at Mill Lane Direct180 MW
- Mill Lane Solar PV grid connection180 MW
- Battery storage 175 MW grid connection at West Boldon Farm BESS Direct175 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.