Grid connection · England, United Kingdom

Battery storage 30 MW grid connection at Foxcover Road BESS

Battery storage 30 MW grid connection at Foxcover Road BESS is a planned grid connection in England, United Kingdom, with 30 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Foxcover Road BESS)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toFox Cover Road - Battery Energy Storage (matched by coordinates+technology+capacity, 0.27 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toOfferton (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity30 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date19 May 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage33 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.8889, -1.4523Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Fox Cover Road - Battery Energy Storage (planning authority Sunderland, reference 23/01981/FUL)
  2. Permit applied for: Fox Cover Road - Battery Energy Storage (planning authority Sunderland, reference 23/01981/FUL)

How it compares

Battery storage 30 MW grid connection at Foxcover Road BESS is the 857th-largest of 2,533 grid connections in England and the 1,333rd-largest of 3,903 in the United Kingdom by capacity; its 30 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England857th of 2,533319,370 MW<0.1%
United Kingdom1,333rd of 3,903446,745 MW<0.1%
All grid connections in our data4,846th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 295 power plants (92 operating, 1,259 MW), 164 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fox Cover Road - Battery Energy StoragePower plant30 MWPermitted0.3 km
Calsonic Kansei - Solar ArrayPower plant2.07 MWPermitted0.4 km
Hastings Hill Farm, Foxcover Road - Battery Energy StoragePower plant38 MWPermitted0.6 km
OffertonSubstation——0.8 km
Offerton 33/11kVSubstation——0.8 km
High BarmstonSubstation——2.7 km
Stellium Newcastle CampusData center——15 km
DXC Wynyard Data CenterData center——30 km
Lumen Technologies data center, MiddlesbroughData center——37 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page