Substation · England, United Kingdom

Aycliffe Industrial

Aycliffe Industrial is a substation in England, United Kingdom, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)None (rag: Green)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Full (rag: Red)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom0 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom0 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity19 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimaryNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromNortonNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromDarlington NorthNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.6114, -1.5652Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 263 grid connections (131 operating, 1,282 MW), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Waste 2.28 MW grid connection at HeighingtonGrid connection2.28 MWOperating0.8 km
Hydro Polymers grid connectionGrid connection4.66 MWOperating1.3 km
Hydro Polymers grid connectionGrid connection3.65 MWOperating1.3 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other substations in England

All 1215 substations in England, United Kingdom

Data on this page