Grid connection · England, United Kingdom

Battery storage and Solar 55 MW grid connection at Salton Lane Hybrid

Battery storage and Solar 55 MW grid connection at Salton Lane Hybrid is a planned grid connection in England, United Kingdom, with 55 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Salton Lane Hybrid)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toMalton Grid (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity55 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date9 Sept 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.2131, -0.9014Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage and Solar 55 MW grid connection at Salton Lane Hybrid is the 515th-largest of 2,533 grid connections in England and the 724th-largest of 3,903 in the United Kingdom by capacity; its 55 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England515th of 2,533319,370 MW<0.1%
United Kingdom724th of 3,903446,745 MW<0.1%
All grid connections in our data3,653rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 188 power plants (45 operating, 616 MW), 93 substations and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
KirbymoorsideSubstation——4.9 km
Windmill Farm Solar Farm (Old Malton)Power plant30.4 MWPermitted8.9 km
Windmill Farm Solar Farm (Old Malton)Power plant12.6 MWPermitted8.9 km
Showfield LanePower plant5 MWPermitted10 km
MaltonSubstation——10 km
Malton GridSubstation——10 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned37 km
Yorkshire GREENTransmission line—Permitted42 km