Battery storage 80 MW grid connection at Newburn Bridge BESS Direct

Battery storage 80 MW grid connection at Newburn Bridge BESS Direct is a planned grid connection in England, United Kingdom, with 80 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Newburn Bridge BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toStella South (via: gsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity80 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date11 Mar 2022Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.9802, -1.7452Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage 80 MW grid connection at Newburn Bridge BESS Direct is the 411th-largest of 2,533 grid connections in England and the 538th-largest of 3,903 in the United Kingdom by capacity; its 80 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England411th of 2,533319,370 MW<0.1%
United Kingdom538th of 3,903446,745 MW<0.1%
All grid connections in our data3,243rd of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 236 power plants (78 operating, 1,098 MW) and 135 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Newburn Bridge Road - Battery Storage FacilityPower plant100 MWPermitted0.6 km
Newburn BESS - Battery Energy Storage SystemPower plant90 MWPlanned0.9 km
Stella SouthSubstation——1.0 km
Stella NorthSubstation——1.4 km
BlucherSubstation——1.6 km
Path HeadPower plant1 MWOperating2.0 km