Grid connection · England, United Kingdom

Battery storage and Solar 99.8 MW grid connection at Birdstall Estate Hybrid

Battery storage and Solar 99.8 MW grid connection at Birdstall Estate Hybrid is a planned grid connection in England, United Kingdom, with 99.8 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Birdstall Estate Hybrid)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toMalton Grid (via: bsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity99.8 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date3 May 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.1441, -0.7339Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage and Solar 99.8 MW grid connection at Birdstall Estate Hybrid is the 360th-largest of 2,533 grid connections in England and the 465th-largest of 3,903 in the United Kingdom by capacity; its 99.8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England360th of 2,533319,370 MW<0.1%
United Kingdom465th of 3,903446,745 MW<0.1%
All grid connections in our data3,064th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 178 power plants (45 operating, 3,214 MW), 85 substations and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Malton GridSubstation——3.1 km
Showfield LanePower plant5 MWPermitted3.9 km
MaltonSubstation——4.1 km
Windmill Farm Solar Farm (Old Malton)Power plant30.4 MWPermitted4.4 km
Windmill Farm Solar Farm (Old Malton)Power plant12.6 MWPermitted4.4 km
YedinghamSubstation——8.9 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned34 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled43 km
Yorkshire GREENTransmission line—Permitted45 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom