Battery storage 28 MW grid connection at Guisborough BESS Direct

Battery storage 28 MW grid connection at Guisborough BESS Direct is a planned grid connection in England, United Kingdom, with 28 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connection site: Guisborough BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Accepted To Connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toLackenby (via: bsp)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toA171, Guisborough Woods - Battery Energy Storage System (method: coordinates+technology+capacity, distance km: 0.12)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity28 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date26 Sept 2024Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.5447, -1.0603Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage 28 MW grid connection at Guisborough BESS Direct is the 906th-largest of 2,533 grid connections in England and the 1,438th-largest of 3,903 in the United Kingdom by capacity; its 28 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England906th of 2,533319,370 MW<0.1%
United Kingdom1,438th of 3,903446,745 MW<0.1%
All grid connections in our data4,688th of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 215 power plants (68 operating, 685 MW), 103 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
A171, Guisborough Woods - Battery Energy Storage SystemPower plant28 MWPermitted0.1 km
North Cote Farm & Park Farm, Dunsdale - Solar ArraysPower plant49.9 MWPermitted0.1 km
Guisborough T1 T2Substation——0.3 km
Bank Field Wind FarmPower plant17 MWCancelled1.2 km
LackenbySubstation——5.3 km
RedcarSubstation——6.2 km
Morven Hawthorn Pit Grid Connection ProjectTransmission line—Planned46 km