Grid connection · England, United Kingdom

Battery storage and Solar 59.9 MW grid connection at Low Bohemia BESS Direct

Battery storage and Solar 59.9 MW grid connection at Low Bohemia BESS Direct is a planned grid connection in England, United Kingdom, with 59.9 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Low Bohemia BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSutton-on-the-Forest, Brownmoor Lane - Solar Park (matched by coordinates+technology+capacity, 0.11 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toOsbaldwick (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity59.9 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date15 Jan 2021Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.0347, -1.1148Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit applied for: Sutton-on-the-Forest, Brownmoor Lane - Solar Park (planning authority York, reference ZB25/01321/FUL)

How it compares

Battery storage and Solar 59.9 MW grid connection at Low Bohemia BESS Direct is the 500th-largest of 2,533 grid connections in England and the 695th-largest of 3,903 in the United Kingdom by capacity; its 59.9 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England500th of 2,533319,370 MW<0.1%
United Kingdom695th of 3,903446,745 MW<0.1%
All grid connections in our data3,886th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 259 power plants (67 operating, 3,531 MW), 186 substations, 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Sutton-on-the-Forest, Brownmoor Lane - Solar ParkPower plant49.9 MWPlanned0.1 km
Sutton-on-the-Forest, Brownmoor Lane -BESSPower plant10 MWPlanned0.1 km
Overton Grange, Overton Road - Solar Farm Battery Energy StoragePower plant49.9 MWPlanned4.5 km
Moor Monkton PumpsSubstation——6.1 km
Rawcliffe LaneSubstation——6.1 km
PoppletonSubstation——6.8 km
Yorkshire GREENTransmission line—Permitted18 km
VocaLinkData center——30 km
HSBC Wakefield Data CentreData center——41 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page