Substation · England, United Kingdom

Rawcliffe Lane

Rawcliffe Lane is an 11 kV primary substation in England, United Kingdom, with 5.51 MVA of demand headroom and 16.7 MW of generation headroom, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Demand headroom5.51 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Generation headroom16.7 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Firm capacity22 MVANorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
LevelPrimary substationNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromOsbaldwickNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Fed fromMelrosegateNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (offtake)Limited (amber on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Congestion (feed-in)Full (red on the heat map)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.9797, -1.1065Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 340 grid connections (167 operating, 1,924 MW), 329 power plants (90 operating, 3,847 MW), 4 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gas 1.161 MW grid connection at Foss IslandsGrid connection1.16 MWOperating1.9 km
Nestle UK Ltd (Haxby Road) grid connectionGrid connection9.98 MWOperating2.3 km
Battery storage 60 MW grid connection at Wheatlands BESSGrid connection60 MWPlanned2.4 km
Overton Grange, Overton Road - Solar Farm Battery Energy StoragePower plant49.9 MWPlanned4.2 km
Harewood Whin Landfill SitePower plant2.4 MWOperating4.7 km
Poppleton Solar FarmPower plant32.6 MWPermitted5.0 km
Yorkshire GREENTransmission line—Permitted14 km
VocaLinkData center——30 km
HSBC Wakefield Data CentreData center——35 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Candidate sites around this substation

5 sites of land near Rawcliffe Lane have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in England

All 1666 substations in England, United Kingdom