Grid connection · England, United Kingdom

Battery storage 100 MW grid connection at The Tavern BESS Direct

Battery storage 100 MW grid connection at The Tavern BESS Direct is a planned grid connection in England, United Kingdom, with 100 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at The Tavern BESS Direct)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toSpennymoor GSP (via a grid supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity100 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date3 Apr 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage132 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.7005, -1.5457Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its grid operator? Ask us.

How it compares

Battery storage 100 MW grid connection at The Tavern BESS Direct is the 311th-largest of 2,533 grid connections in England and the 412th-largest of 3,903 in the United Kingdom by capacity; its 100 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England311th of 2,533319,370 MW<0.1%
United Kingdom412th of 3,903446,745 MW<0.1%
All grid connections in our data2,861st of 7,6161,281,251 MW<0.1%

Nearby

Within 50 km of this grid connection: 291 power plants (91 operating, 805 MW) and 167 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Spennymoor 132/66kVSubstation——0.7 km
South Thinford Lane, Thinford - Energy StoragePower plant99.9 MWPermitted0.8 km
Spennymoor 66/20kVSubstation——1.0 km
Spennymoor GSPSubstation——1.0 km
Spennymoor Greener Grid ParkPower plant200 MWPermitted1.2 km
Croxdale Farms, Hett Moor Farm - Solar FarmPower plant49.9 MWPermitted1.5 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom