Grid connection · England, United Kingdom

Harrogate District Hospital grid connection

Harrogate District Hospital grid connection is a planned grid connection in England, United Kingdom, with 1.75 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Starbeck)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toStarbeck (via a primary substation)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1.75 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyGasNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date28 Mar 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage11 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates53.9954, -1.5160Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Harrogate District Hospital grid connection is the 2,251st-largest of 2,533 grid connections in England and the 3,490th-largest of 3,903 in the United Kingdom by capacity; its 1.75 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,251st of 2,533319,370 MW<0.1%
United Kingdom3,490th of 3,903446,745 MW<0.1%
All grid connections in our data7,499th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 274 substations, 270 power plants (73 operating, 6,272 MW), 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
StarbeckSubstation——1.1 km
Jenny Field DrivePower plant5 MWCancelled2.2 km
OatlandsSubstation——2.3 km
Harrogate 132/11kV DirectSubstation——2.6 km
VocaLinkData center——4.1 km
Low Moor Lane, Scotton - Battery Energy Storage SystemPower plant200 MWPlanned4.4 km
High Boar Wind FarmPower plant8 MWCancelled6.5 km
Yorkshire GREENTransmission line—Permitted19 km
GridJetData center——24 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom