Grid connection · England, United Kingdom
Battery storage 250 MW grid connection at Old Hill Farm Direct
Battery storage 250 MW grid connection at Old Hill Farm Direct is a planned grid connection in England, United Kingdom, with 250 MW of capacity, connected by Northern Powergrid (Northeast) plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England (connects at Old Hill Farm Direct) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Lackenby (via a grid supply point) | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Attached to | Old Hall Farm, Lackenby - BESS (matched by coordinates+technology+capacity, 0.37 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 250 MW | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Technology | Battery storage | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Grid operator | Northern Powergrid (Northeast) plc | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Queue date | 10 May 2023 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Voltage | 132 kV | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
| Coordinates | 54.5687, -1.1263 | Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Permit applied for: Old Hall Farm, Lackenby - BESS (planning authority Redcar and Cleveland, reference R/2025/0500/FFM)
How it compares
Battery storage 250 MW grid connection at Old Hill Farm Direct is the 225th-largest of 2,533 grid connections in England and the 308th-largest of 3,903 in the United Kingdom by capacity; its 250 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 225th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 308th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 1,434th of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 240 power plants (80 operating, 746 MW), 111 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Lackenby | Power plant | 49.9 MW | Cancelled | 0.3 km |
| Old Hall Farm, Lackenby - BESS | Power plant | 244 MW | Planned | 0.4 km |
| Lackenby | Substation | — | — | 0.4 km |
| Greystones Road, Grangetown - Battery Energy Storage System | Power plant | 60 MW | Permitted | 0.6 km |
| Grangetown | Substation | — | — | 2.1 km |
| Spencerbeck | Substation | — | — | 4.1 km |
| Data center, Redcar (OSM way 1055031579) | Data center | — | — | 6.6 km |
| Lumen Technologies data center, Middlesbrough | Data center | — | — | 7.1 km |
| Pulsant data center, England | Data center | — | — | 12 km |
Grid operator and place
More from Northern Powergrid (Northeast) plc
- Biomass 399 MW grid connection at Lynemouth Power Direct399 MW
- Battery storage and Solar 320.3 MW grid connection at Colliery Farm SPV & BESS Direct320 MW
- Battery storage and Solar 200 MW grid connection at Clock and Grimeston Farm Direct200 MW
- Solar 200 MW grid connection at Scampston Solar Direct200 MW
- Solar 180 MW grid connection at Mill Lane Direct180 MW
- Mill Lane Solar PV grid connection180 MW
- Battery storage 175 MW grid connection at West Boldon Farm BESS Direct175 MW
- Battery storage and Solar 160 MW grid connection at Sheriff Hutton 80MW Hybrid160 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.