Grid connection · England, United Kingdom

Battery storage and Solar 75 MW grid connection at High Barnes Farm Hybrid

Battery storage and Solar 75 MW grid connection at High Barnes Farm Hybrid is a planned grid connection in England, United Kingdom, with 75 MW of capacity, connected by Northern Powergrid (Northeast) plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at High Barnes Farm Hybrid)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Attached toHartmoor (via a bulk supply point)Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Capacity75 MWNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyBattery storageNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
TechnologySolarNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNorthern Powergrid (Northeast) plcNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Queue date12 Dec 2023Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Voltage66 kVNorthern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026
Coordinates54.6851, -1.3080Northern Powergrid open data portal · Northern Powergrid Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

How it compares

Battery storage and Solar 75 MW grid connection at High Barnes Farm Hybrid is the 433rd-largest of 2,533 grid connections in England and the 568th-largest of 3,903 in the United Kingdom by capacity; its 75 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England433rd of 2,533319,370 MW<0.1%
United Kingdom568th of 3,903446,745 MW<0.1%
All grid connections in our data3,617th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 276 power plants (85 operating, 764 MW), 162 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
High Barnes Farm, Coal Lane - Battery StoragePower plant25 MWPermitted0.6 km
High Barnes Farm, Coal Lane - Solar FarmPower plant49.9 MWPermitted0.6 km
High Volts Wind FarmPower plant5.5 MWOperating1.3 km
HartmoorSubstation——2.2 km
Hartmoor 66/20kVSubstation——2.2 km
WynyardSubstation——5.1 km
DXC Wynyard Data CenterData center——5.8 km
Lumen Technologies data center, MiddlesbroughData center——13 km
Pulsant data center, EnglandData center——15 km

Grid operator and place

More from Northern Powergrid (Northeast) plc

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page