Power plant · Redcar and Cleveland, England, United Kingdom

Lackenby

Lackenby is a cancelled power plant in Redcar and Cleveland, England, United Kingdom, with 49.9 MW of capacity, operated by EDF Energy Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand at, Crow Lane, Old Lackenby, Middlesbrough, TS6 8DNDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date24 Oct 2019 (permit R/2019/0433/FF, Town and Country Planning Act, issued by Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jul 2019 (reference R/2019/0433/FF, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Oct 2019 (granted, reference R/2019/0433/FF, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEDF Energy RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5677, -1.1220DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Lackenby is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England175th of 3,43071,985 MW<0.1%
United Kingdom362nd of 5,050115,642 MW<0.1%
All power plants in our data1,841st of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 225 grid connections (113 operating, 1,177 MW), 108 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 250 MW grid connection at Old Hill Farm DirectGrid connection250 MWPlanned0.3 km
LackenbySubstation——0.7 km
Gas 12 MW grid connection at GrangetownGrid connection12 MWOperating2.1 km
Landfill gas 2.027 MW grid connection at GrangetownGrid connection2.03 MWOperating2.3 km
GrangetownSubstation——2.4 km
SpencerbeckSubstation——4.4 km
Data center, Redcar (OSM way 1055031579)Data center——6.4 km
Lumen Technologies data center, MiddlesbroughData center——7.4 km
Pulsant data center, EnglandData center——13 km

Operator and place

More from EDF Energy Renewables

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page