Power plant · Redcar and Cleveland, England, United Kingdom
Lackenby
Lackenby is a cancelled power plant in Redcar and Cleveland, England, United Kingdom, with 49.9 MW of capacity, operated by EDF Energy Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Redcar and Cleveland (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land at, Crow Lane, Old Lackenby, Middlesbrough, TS6 8DN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission expired) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 24 Oct 2019 (permit R/2019/0433/FF, Town and Country Planning Act, issued by Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 25 Jul 2019 (reference R/2019/0433/FF, planning authority Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 24 Oct 2019 (granted, reference R/2019/0433/FF, planning authority Redcar and Cleveland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | EDF Energy Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.5677, -1.1220 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Lackenby is the 175th-largest of 3,430 power plants in England and the 362nd-largest of 5,050 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 175th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 362nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 1,841st of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 225 grid connections (113 operating, 1,177 MW), 108 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 250 MW grid connection at Old Hill Farm Direct | Grid connection | 250 MW | Planned | 0.3 km |
| Lackenby | Substation | — | — | 0.7 km |
| Gas 12 MW grid connection at Grangetown | Grid connection | 12 MW | Operating | 2.1 km |
| Landfill gas 2.027 MW grid connection at Grangetown | Grid connection | 2.03 MW | Operating | 2.3 km |
| Grangetown | Substation | — | — | 2.4 km |
| Spencerbeck | Substation | — | — | 4.4 km |
| Data center, Redcar (OSM way 1055031579) | Data center | — | — | 6.4 km |
| Lumen Technologies data center, Middlesbrough | Data center | — | — | 7.4 km |
| Pulsant data center, England | Data center | — | — | 13 km |
Operator and place
More from EDF Energy Renewables
- Springwell, Lincoln - Springwell Solar Farm & Battery Storage800 MW · permitted
- Abergelli Farm, Felindre - Battery Storage250 MW · planned
- Clash Gour225 MW · permitted
- Dorenell Wind Farm (Previously Site A and B Scaut Hill)177 MW
- Dorenell Wind Farm (extension)175 MW
- Fallago Rig144 MW
- Hickling Lane, Swainsthorpe -Battery Storage114 MW · permitted
- Heathland Wind Farm80 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.