Power plant · Redcar and Cleveland, England, United Kingdom

Greystones Road, Grangetown - Battery Energy Storage System

Greystones Road, Grangetown - Battery Energy Storage System is a permitted power plant in Redcar and Cleveland, England, United Kingdom, with 60 MW of capacity, operated by Sembcorp Utilities UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWilton Internationaln Off A1053 Greystones Roadn Grangetown, TS6 8JHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Dec 2021 (permit R/2021/0888/CL, Town and Country Planning Act, issued by Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Oct 2021 (reference R/2021/0888/CL, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Dec 2021 (granted, reference R/2021/0888/CL, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSembcorp Utilities UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity60 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5738, -1.1263DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Greystones Road, Grangetown - Battery Energy Storage System is the 379th-largest of 2,174 power plants planned, permitted or under construction in England and the 672nd-largest of 3,222 in the United Kingdom by capacity; its 60 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England379th of 2,174186,088 MW<0.1%
United Kingdom672nd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,661st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 228 grid connections (116 operating, 1,220 MW), 112 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 250 MW grid connection at Old Hill Farm DirectGrid connection250 MWPlanned0.6 km
LackenbySubstation——0.8 km
Gas 12 MW grid connection at GrangetownGrid connection12 MWOperating1.4 km
Landfill gas 2.027 MW grid connection at GrangetownGrid connection2.03 MWOperating1.6 km
GrangetownSubstation——1.7 km
SpencerbeckSubstation——4.1 km
Data center, Redcar (OSM way 1055031579)Data center——6.4 km
Lumen Technologies data center, MiddlesbroughData center——7.0 km
Pulsant data center, EnglandData center——12 km

Operator and place

More from Sembcorp Utilities UK Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page