NYISO interconnection queue
Interconnection queue workbook: serial and 2024 cluster requests with queue position, developer, project name, request date, summer and winter MW, type/fuel, county, POI, utility, status and proposed dates; also load, withdrawn and in-service sheets (New York). Rare Context republishes 1,775 facts from NYISO interconnection queue under No restriction on the posted data, linked to owners and places.
About this source
| Publisher's page | https://www.nyiso.com/interconnections |
| Licence | No restriction on the posted data |
| Credit | NYISO interconnection queue |
| Licence terms | No restriction on the posted data: the NYISO Legal Notice (https://www.nyiso.com/legal-notice) disclaims warranties, prohibits reuse of images and videos as stand-alone files and of NYISO trademarks, and says access confers no licence to NYISO's intellectual property; it sets no terms on reusing posted queue data, which are facts. Checked 2026-10-24 |
| Coverage | New York |
| Access | Monthly XLSX https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue.xlsx |
| Refresh | Monthly |
Download
Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.
| File | Records | Updated | Last checked |
|---|---|---|---|
| queue.jsonl | 2,265 | 24 Oct 2026 | 24 Oct 2026 |
Pages built from this source
Grid connections
- Vineyard Mid-Atlantic West grid connection (Nyiso C24-003)1,321 MW
- Bluepoint Wind 1 grid connection (Nyiso C24-021)1,310 MW
- Sunrise Wind grid connection (Nyiso 0766)880 MW
- Empire Wind 1 grid connection (Nyiso 0737)816 MW
- EF Barrett - 2 grid connection (Nyiso C26-0053)627 MW
- Evergreen Ridge Power grid connection (Nyiso C26-0001-1)624 MW
- Cider Solar grid connection (Nyiso 0811)500 MW
- Adirondack Energy Storage Center grid connection (Nyiso C26-0042)500 MW
Data on this page
- NYISO interconnection queue. NYISO interconnection queue, No restriction on the posted data.