Data center · England, United Kingdom

Lumen Technologies data center, Middlesbrough

Lumen Technologies data center, Middlesbrough is a data center in England, United Kingdom, operated by Lumen Technologies.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
AddressZetland Road, Middlesbrough, TS1 1EHOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
OperatorLumen TechnologiesOpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Building footprint388 m² (building)OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026
Coordinates54.5785, -1.2351OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026

Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.

Request research

How its operator compares

Lumen Technologies operates 2 of the 191 data centers in the United Kingdom in our data with a named owner; 20 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankData centersShare
Equinix, Inc.1st136.8%
Digital Realty2nd105.2%
Virtus2nd105.2%
Pulsant4th84.2%
NTT Limited5th63.1%
Lumen Technologies21st21%

Nearby

Within 50 km of this data center: 259 power plants (84 operating, 792 MW), 242 grid connections (125 operating, 1,248 MW) and 135 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Gas 61.75 MW grid connection at Viking PowerGrid connection61.8 MWOperating0.2 km
Teesside Green Energy Plant (Waste AD)Power plant4.8 MWOperating0.7 km
Waste 4.921 MW grid connection at Faraday StreetGrid connection4.92 MWOperating0.9 km
Wilton Engineering Services, Port Clarence Offshore Base - Solar PanelsPower plant1.2 MWPermitted1.2 km
Solar 1.26 MW grid connection at North Tees T3 T4Grid connection1.26 MWPlanned1.2 km
Port Clarence Biomass PlantPower plant40 MWUnder construction1.2 km
Faraday StreetSubstation——1.3 km
North TeesSubstation——2.1 km
North Tees T1 T2Substation——2.1 km

Operator and place

More from Lumen Technologies

Other data centers in England

All 245 data centers in England, United Kingdom

Data on this page