Data center · England, United Kingdom
Lumen Technologies data center, Middlesbrough
Lumen Technologies data center, Middlesbrough is a data center in England, United Kingdom, operated by Lumen Technologies.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | Zetland Road, Middlesbrough, TS1 1EH | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Lumen Technologies | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 388 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 54.5785, -1.2351 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchHow its operator compares
Lumen Technologies operates 2 of the 191 data centers in the United Kingdom in our data with a named owner; 20 owners have more. Counts cover the data centers in our data that name an owner, holder or operator; an asset with several owners counts for each.
| Operator in United Kingdom | Rank | Data centers | Share |
|---|---|---|---|
| Equinix, Inc. | 1st | 13 | 6.8% |
| Digital Realty | 2nd | 10 | 5.2% |
| Virtus | 2nd | 10 | 5.2% |
| Pulsant | 4th | 8 | 4.2% |
| NTT Limited | 5th | 6 | 3.1% |
| Lumen Technologies | 21st | 2 | 1% |
Nearby
Within 50 km of this data center: 259 power plants (84 operating, 792 MW), 242 grid connections (125 operating, 1,248 MW) and 135 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Gas 61.75 MW grid connection at Viking Power | Grid connection | 61.8 MW | Operating | 0.2 km |
| Teesside Green Energy Plant (Waste AD) | Power plant | 4.8 MW | Operating | 0.7 km |
| Waste 4.921 MW grid connection at Faraday Street | Grid connection | 4.92 MW | Operating | 0.9 km |
| Wilton Engineering Services, Port Clarence Offshore Base - Solar Panels | Power plant | 1.2 MW | Permitted | 1.2 km |
| Solar 1.26 MW grid connection at North Tees T3 T4 | Grid connection | 1.26 MW | Planned | 1.2 km |
| Port Clarence Biomass Plant | Power plant | 40 MW | Under construction | 1.2 km |
| Faraday Street | Substation | — | — | 1.3 km |
| North Tees | Substation | — | — | 2.1 km |
| North Tees T1 T2 | Substation | — | — | 2.1 km |
Operator and place
More from Lumen Technologies
- Lumen Baltimoredata center
- Lumen Albany 4data center
- Lumen Madison 1 Data Centerdata center
- Lumen McLeandata center
- Lumendata center
- Lumen Santa Claradata center
- Lumendata center
- Lumen McLean 1data center
Other data centers in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.