Old Hall Farm, Lackenby - BESS

Old Hall Farm, Lackenby - BESS is a planned battery storage plant in Redcar and Cleveland, England, United Kingdom, with 244 MW of capacity, operated by Lackenby Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationRedcar and Cleveland (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressN/O B1380 (Parcel A) & S/O A174 (Parcel B), Lackenby, Middlesbrough, TS6 8DLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Aug 2025 (reference R/2025/0500/FFM, planning authority Redcar and Cleveland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLackenby Energy Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity244 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.5656, -1.1241DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Redcar and Cleveland, reference R/2025/0500/FFM)

How it compares

Old Hall Farm, Lackenby - BESS is the 161st-largest of 1,650 power plants planned, permitted or under construction in England and the 247th-largest of 2,548 in the United Kingdom by capacity; its 244 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England161st of 1,650171,264 MW0.14%
United Kingdom247th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data646th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 225 grid connections (113 operating, 1,177 MW), 108 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage 250 MW grid connection at Old Hill Farm DirectGrid connection250 MWPlanned0.4 km
LackenbySubstation——0.6 km
Gas 12 MW grid connection at GrangetownGrid connection12 MWOperating2.2 km
Landfill gas 2.027 MW grid connection at GrangetownGrid connection2.03 MWOperating2.4 km
GrangetownSubstation——2.4 km
SpencerbeckSubstation——4.3 km
Data center, Redcar (OSM way 1055031579)Data center——6.6 km
Lumen Technologies data center, MiddlesbroughData center——7.3 km
Pulsant data center, EnglandData center——12 km