Event stream · The United Kingdom
Latest changes in the United Kingdom
Dated events from official notices and registers: permits applied for, granted or refused, connection queue entries and agreements, withdrawals, construction and commissioning. Each links to the record it concerns and to the notice or register it comes from. In the United Kingdom: 20,595 events, the latest on 16 Oct 2026.
By asset class
- Solar8,268 here
- Wind5,455 here
- Battery storage3,006 here
- Gas, oil and coal44 here
- Nuclear6 here
- Hydro and marine391 here
- Hydrogen74 here
- Bioenergy and waste2,732 here
- Grid and substations30 here
- Brownfield land635 here
- The United Kingdom: country profile
Latest events
| Date | Event | Concerns | Place | Source |
|---|---|---|---|---|
| 16 Oct 2026 | Permit applied for (planning authority The Planning Inspectorate, reference EN020034) | North Humber to High Marnham | Bassetlaw, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 9 Oct 2026 | Permit granted (450 MW, planning authority The Planning Inspectorate, reference EN010163) | Steeple Renewables Project | Bassetlaw, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 8 Oct 2026 | Permit granted (500 MW, planning authority The Planning Inspectorate, reference EN010170) | Green Hill Solar Farm | North Northamptonshire, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 21 Sept 2026 | Permit applied for (200 MW, planning authority The Planning Inspectorate, reference EN0110025) | Lighthouse Green Fuels Project | Stockton-on-Tees, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 14 Sept 2026 | Permit granted (planning authority The Planning Inspectorate, reference EN020032) | Morgan and Morecambe Offshore Wind Farms Transmission Assets | Fylde, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 21 Aug 2026 | Permit granted (400 MW, planning authority The Planning Inspectorate, reference EN010151) | Beacon Fen Energy Park | North Kesteven, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 30 Jul 2026 | Withdrawn (2,000 MW, planning authority The Planning Inspectorate, reference EN0110009) | Walpole Flexible Generation Project | King's Lynn and West Norfolk, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 8 Jul 2026 | Permit granted (planning authority The Planning Inspectorate, reference EN010159) | One Earth Solar Farm | Newark and Sherwood, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 8 Jul 2026 | Permit granted (740 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010159) | One Earth Solar Farm | Bassetlaw, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 3 Jul 2026 | Permit applied for (750 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN0110020) | Whitestone Solar Farm | Rotherham, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 2 Jul 2026 | Permit granted (150 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010155) | Dean Moor Solar Farm & Battery Storage | Cumberland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 2 Jul 2026 | Permit granted (320 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010157) | Peartree Hill Solar Farm | East Riding of Yorkshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 2 Jul 2026 | Permit granted (planning authority The Planning Inspectorate, reference EN010157) | Peartree Hill Solar Farm | East Riding of Yorkshire, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 2 Jul 2026 | Permit granted (planning authority The Planning Inspectorate, reference EN010155) | Dean Moor Solar Farm | Cumberland, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 26 Jun 2026 | Commissioned (60 MW) | Gonerby Moor, Great Gonerby - Solar Farm | South Kesteven, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 25 Jun 2026 | Permit applied for (2,000 MW, planning authority Marine Scotland) | Machair | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 17 Jun 2026 | Withdrawn (26 MW, planning authority Barnsley, reference 2024/1091) | Mitchells Industrial Park, Bradberry Balk Lane - Battery Energy Storage | Barnsley, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 12 Jun 2026 | Commissioned (1.49 MW) | Principality Stadium, Westgate Street - Solar panels | Cardiff, Wales, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 11 Jun 2026 | Permit granted (21 MW, planning authority Basingstoke and Deane, reference 23/02000/FUL) | Lower Wyke Farm, St Mary Bourne - Solar Farm | Basingstoke and Deane, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 11 Jun 2026 | Permit granted (21 MW, appeal granted, planning authority Basingstoke and Deane, reference 23/02000/FUL) | Lower Wyke Farm, St Mary Bourne - Solar Farm | Basingstoke and Deane, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 11 Jun 2026 | Permit refused (49.9 MW, planning authority Epping Forest, reference EPF/1428/25) | Upland Road - 49.9 Megawatt Solar Panels | Epping Forest, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 10 Jun 2026 | Permit granted (1.27 MW, planning authority Buckinghamshire, reference PL/26/03157/PRASP) | Wipac Group, London Road - Solar Panels | Buckinghamshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 10 Jun 2026 | Permit applied for (750 MW, planning authority The Planning Inspectorate, reference EN0110020) | Whitestone Solar Farm | Rotherham, England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 9 Jun 2026 | Withdrawn (19.8 MW, planning authority Highland, reference 26/01345/FUL) | Mybster Farm, Watten - Battery Storage | Highland, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit granted (85 MW, planning authority Rushcliffe, reference 24/00161/FUL) | Old Wood Energy Park - Battery Energy Storage | Rushcliffe, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit applied for (4.5 MW, planning authority West Northamptonshire, reference 2026/2336/PA) | Sainsburys, Style Way - Solar Panels | West Northamptonshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit granted (37 MW, planning authority Fife, reference 18/01583/PPP) | STOR Field 9 | Fife, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit granted (49.9 MW, planning authority Rushcliffe, reference 24/00161/FUL) | Old Wood Energy Park - Solar Pv Panel | Rushcliffe, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit granted (49.9 MW, appeal granted, planning authority Rushcliffe, reference 24/00161/FUL) | Old Wood Energy Park - Solar Pv Panel | Rushcliffe, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit granted (85 MW, appeal granted, planning authority Rushcliffe, reference 24/00161/FUL) | Old Wood Energy Park - Battery Energy Storage | Rushcliffe, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 Jun 2026 | Permit granted (1.5 MW, planning authority West Berkshire, reference 25/02133/FUL) | Exolum, Silver Lane - Solar PV Array | West Berkshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 3 Jun 2026 | Permit granted (10 MW, planning authority North Northamptonshire, reference NE/24/01235/FUL) | Quarry, Ditchford Lane - Solar Farm | North Northamptonshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 3 Jun 2026 | Permit granted (13 MW, planning authority Cumberland, reference FUL/2025/0080) | Ewanrigg Farmhouse, Ewanrigg - Solar Farm | Cumberland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 3 Jun 2026 | Permit refused (40 MW, planning authority West Suffolk, reference DC/25/0909/FUL) | River Linnet Solar Farm, Harram Hill - Solar Farm | West Suffolk, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 3 Jun 2026 | Permit granted (100 MW, planning authority Bradford, reference 25/02248/MAF) | Peat Dykes Farm, Harrop Lane - Battery Energy Storage System | Bradford, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 3 Jun 2026 | Permit granted (10 MW, appeal granted, planning authority North Northamptonshire, reference NE/24/01235/FUL) | Quarry, Ditchford Lane - Solar Farm | North Northamptonshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 2 Jun 2026 | Permit applied for (3.2 MW, planning authority Cumberland, reference REJ/2026/0002) | Chapel Banks, Curwen Road - Solar Panels | Cumberland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 2 Jun 2026 | Permit granted (500 MW, planning authority Bassetlaw, reference 24/01470/FUL) | Torksey Ferry Road, Rampton - Battery Energy Storage | Bassetlaw, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Permit applied for (40 MW, planning authority High Peak, reference HPK/2026/0188) | Hardybarn Lane, Green Fairfield - Battery Energy Storage Facility | High Peak, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Construction started (78 MW) | Gainsborough Road, Saundby - Solar Farm | Bassetlaw, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Permit granted (2.08 MW, planning authority Telford and Wrekin, reference TWC/2026/0269) | Princess Royal Hospital, Grainger Drive - Solar PV Panels | Telford and Wrekin, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Commissioned (12 MW) | Rolleston Park Farm, Lodge Hill - Solar Farm | East Staffordshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Construction started (20 MW) | Lychgate Lane, Aston Flamville - Solar Farm | Blaby, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Construction started (30 MW) | Maes Mawr Solar | Rhondda Cynon Taf, Wales, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Permit granted (49.9 MW, planning authority Cornwall, reference PA25/04503) | Trevarthian Farmhouse - Solar PV Farm & Battery Energy Storage | Cornwall, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Construction started (120 MW) | Gainsborough Road, Saundby - Battery Storage Facility | Bassetlaw, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 1 Jun 2026 | Construction started (61.9 MW) | Highfields Farm, Clifton Lane - Solar Panels | Lichfield, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 29 May 2026 | Permit granted (37 MW, planning authority Buckinghamshire, reference 25/02284/APP) | Oaks Farm - Solar Farm | Buckinghamshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 28 May 2026 | Permit applied for (2.02 MW, planning authority Thanet, reference PN12/TH/26/0333) | Compass House, Columbus Avenue - Solar Panels | Thanet, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 28 May 2026 | Permit refused (100 MW, planning authority Cannock Chase, reference CH/25/0225) | Lime Lane, Pelsall - Battery Energy Storage System | Cannock Chase, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 28 May 2026 | Permit applied for (1.2 MW, planning authority South Ribble, reference 07/2026/00387/FUL) | Leyland Trucks, Croston Road - Solar Array | South Ribble, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 27 May 2026 | Permit applied for (2 MW, planning authority Tameside, reference 26/00405/FUL) | Tameside General Hospital - Energy Centre | Tameside, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 26 May 2026 | Permit granted (228 MW, planning authority Canterbury, reference CA/25/00418) | Woodlands Farm, Calcott Hill - Battery Energy Storage | Canterbury, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 22 May 2026 | Permit granted (10 MW, planning authority Warrington, reference 2025/00969/FULM) | Duckinfield Farm, Hurst Lane - Solar Farm | Warrington, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 22 May 2026 | Permit granted (25 MW, appeal granted, planning authority Leeds, reference 24/05828/FU) | Newton Lane, Ledston - Battery Storage Facility | Leeds, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 22 May 2026 | Permit granted (25 MW, planning authority Leeds, reference 24/05828/FU) | Newton Lane, Ledston - Battery Storage Facility | Leeds, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 21 May 2026 | Permit granted (49.5 MW, planning authority Mole Valley, reference MO/2024/1048) | Cobham Road, Bookham - Solar Farm | Mole Valley, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 21 May 2026 | Permit refused (115 MW, planning authority Basingstoke and Deane, reference 25/01019/FUL) | Frog Lane, Little London - Battery Energy Storage | Basingstoke and Deane, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 21 May 2026 | Permit applied for (200 MW, planning authority Havering, reference P0634.26) | Clay Tye Farm - Energy Storage Facility | Havering, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 21 May 2026 | Permit applied for (1.35 MW, planning authority South Gloucestershire, reference P26/01161/PNRE) | Warburtons Bakery, Western Approach Distribution Park - Solar Panels | South Gloucestershire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 21 May 2026 | Permit granted (49.5 MW, appeal granted, planning authority Mole Valley, reference MO/2024/1048) | Cobham Road, Bookham - Solar Farm | Mole Valley, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 20 May 2026 | Permit granted (125 MW, planning authority East Devon, reference 25/1150/MFUL) | Exeter Substation, Broadclyst - Battery Energy Storage | East Devon, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 20 May 2026 | Permit applied for (1,450 MW, planning authority Marine Scotland) | Morven North Offshore Wind Farm | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 20 May 2026 | Permit applied for (110 MW, planning authority Welsh Government (NSIP), reference CAS-03950-F9K3T4) | Bodelwyddan, Abergele Road - Solar Farm & Battery Storage | Denbighshire, Wales, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 20 May 2026 | Permit applied for (1,450 MW, planning authority Marine Scotland) | Morven South Offshore Wind Farm | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 20 May 2026 | Permit applied for (110 MW, planning authority Welsh Government (NSIP), reference CAS-03950-F9K3T4) | Bodelwyddan, Abergele Road - Solar Farm & Battery Storage | Denbighshire, Wales, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 19 May 2026 | Permit granted (49.9 MW, planning authority Forest of Dean, reference P2061/21/FUL) | Moat Farm - Solar Farm | Forest of Dean, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 19 May 2026 | Permit granted (400 MW, planning authority Swansea, reference 2024/2401/FUL) | Lletty Scilp Farm, Swansea North - Energy Storage System | Swansea, Wales, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 19 May 2026 | Permit refused (18.5 MW, planning authority Somerset, reference 24/00352/FUL) | Mahe Farm, Dunsham Lane - Solar Array | Somerset, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 18 May 2026 | Permit applied for (1,000 MW, planning authority Redcar and Cleveland, reference R/2026/0364/CL) | Tesside GigaPark - Battery Energy Storage System | Redcar and Cleveland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 15 May 2026 | Permit applied for (15 MW, planning authority Scottish Government (S36), reference ECU00005159) | High Mark Wind Farm - Wind Turbines | Dumfries and Galloway, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 15 May 2026 | Permit applied for (20 MW, planning authority Central Bedfordshire, reference CB/26/01392/OUT) | Eastern Way | Central Bedfordshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 15 May 2026 | Permit applied for (8.2 MW, planning authority Central Bedfordshire, reference CB/26/01392/OUT) | Eastern Way | Central Bedfordshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 15 May 2026 | Permit applied for (50.4 MW, planning authority Scottish Government (S36), reference ECU00005159) | High Mark Wind Farm - Wind Turbines | Dumfries and Galloway, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (1,500 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010125) | Dogger Bank South West | England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (20.2 MW, planning authority North Kesteven, reference 25/0521/FUL) | Ferry Lane, Skellingthorpe - Solar Panels | North Kesteven, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (planning authority The Planning Inspectorate, reference EN010119) | North Falls Offshore Wind Farm | England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 14 May 2026 | Permit granted (1,000 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010119) | North Falls Offshore Wind Farm | England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (50 MW, planning authority Melton, reference 24/01038/FUL) | Lumiere Solar Farm | Rutland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (1,500 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010125) | Dogger Bank South East | England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Commissioned (25.6 MW) | Crays Hall Farm - Solar Arrays | Basildon, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (20 MW, planning authority Wakefield, reference 25/00579/FUL) | Owlers Farm, Wakefield Road - Solar Farm | Wakefield, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Permit applied for (25 MW, planning authority East Staffordshire, reference P/2026/00480) | Claymills Sewage Treatment Works, Meadow Lane - Solar Panels | East Staffordshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Permit applied for (5.04 MW, planning authority Moray, reference 26/00589/APP) | RAF Lossiemouth - Solar Panels | Moray, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Permit granted (49.9 MW, planning authority Perth and Kinross, reference 25/00168/FLM) | Tir Artair - Battery Energy Storage Facility | Perth and Kinross, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Permit granted (49.9 MW, planning authority Peterborough, reference 25/01028/FUL) | Malice Farm, French Drove - BESS | South Holland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Withdrawn (planning authority The Planning Inspectorate, reference EN010156) | Maen Hir Solar and Energy Storage Project | Isle of Anglesey, Wales, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 13 May 2026 | Permit refused (49.9 MW, planning authority Perth and Kinross, reference 24/01188/FLM) | Kinnon Park Farm, Methven - Solar Farm & Battery Storage | Perth and Kinross, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Permit granted (49.9 MW, planning authority Peterborough, reference 25/01028/FUL) | Malice Farm, French Drove - Solar Farm | South Holland, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Permit granted (1.23 MW, planning authority North Lincolnshire, reference PA/2026/299) | Co-Op Nisa, Waldo Way - Solar Panels | North Lincolnshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 12 May 2026 | Permit granted (1 MW, planning authority Wakefield, reference 24/00835/CPL) | Dewsbury Sewage, Clough Lane - Solar Panels | Wakefield, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 12 May 2026 | Permit applied for (2.17 MW, planning authority Cherwell, reference 26/01210/F) | Units D E & F, Beaumont Road - Solar Panels | Cherwell, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 12 May 2026 | Permit granted (1 MW, appeal granted, planning authority Wakefield, reference 24/00835/CPL) | Dewsbury Sewage, Clough Lane - Solar Panels | Wakefield, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 11 May 2026 | Permit applied for (1.9 MW, planning authority North Lanarkshire, reference 26/00404/FUL) | Glenhove Pumping Station, Glenhove Road - Solar Array | North Lanarkshire, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 11 May 2026 | Permit applied for (6 MW, planning authority Tonbridge and Malling, reference KCC/TM/0064/2026) | Stangate West Landfill Site, Quarry Hill Road - Solar Park & Battery | Tonbridge and Malling, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 11 May 2026 | Permit applied for (3.1 MW, planning authority North Lanarkshire, reference 26/00404/FUL) | Glenhove Pumping Station, Glenhove Road - BESS | North Lanarkshire, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 8 May 2026 | Permit refused (49.9 MW, planning authority Newark and Sherwood, reference 22/01983/FULM) | Foxholes Farm, Bathley Lane - Solar Farm | Newark and Sherwood, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 7 May 2026 | Permit granted (240 MW, planning authority Cheshire West and Chester, reference 25/00132/FUL) | Mollington - Battery Energy Storage | Cheshire West and Chester, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 7 May 2026 | Permit applied for (12 MW, planning authority Dumfries and Galloway, reference 26/0744/FUL) | West Scales Energy Park | Dumfries and Galloway, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 7 May 2026 | Permit applied for (24.8 MW, planning authority Dumfries and Galloway, reference 26/0744/FUL) | West Scales Energy Park | Dumfries and Galloway, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
Follow these events in a feed reader: Atom feed.
How the stream is built
Every day the collectors fetch the registers again. A notice or register row with a date becomes an event, typed by rules on the register's own codes and words (no language model reads the notices). Where a register shows only the current status, a change between two fetches is dated the day it was first seen, and says so. Every public event is also in the open data download, with its source and licence.
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.