8.55MW Battery grid connection

8.55MW Battery grid connection is a planned grid connection in England, United Kingdom, with 8.55 MW of capacity, held by DNO Consulting Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the source8.55MW BATTERY grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Teffont)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderDNO Consulting LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toTeffont Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toMill Farm, Teffont - Battery Energy Storage (matched by coordinates+technology+capacity, 0.24 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity8.55 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date3 Nov 2021SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date6 Dec 2036 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.0763, -2.0012SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

8.55MW Battery grid connection is the 1,418th-largest of 2,533 grid connections in England and the 2,243rd-largest of 3,903 in the United Kingdom by capacity; its 8.55 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,418th of 2,533319,370 MW<0.1%
United Kingdom2,243rd of 3,903446,745 MW<0.1%
All grid connections in our data5,868th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 327 power plants (154 operating, 1,426 MW), 167 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Mill Farm, Teffont - Battery Energy StoragePower plant8.5 MWPermitted0.2 km
Teffont PrimarySubstation——0.3 km
Tisbury PrimarySubstation——6.8 km
Codford PrimarySubstation——9.2 km
East Farm (Clay Pit Hill) - Extension IIPower plant6 MWCancelled9.3 km
Chicklade EV Service Station - Solar FarmPower plant3 MWPlanned9.7 km
Data Vault - Bournemouth BCP01Data center——40 km
Data center, England (OSM way 996865179)Data center——41 km
Ark Data CentresData center——41 km

Holder, grid operator and place

More from DNO Consulting Ltd

Other grid connections in England

All 3831 grid connections in England, United Kingdom