Pipplepen Farm Solar PV grid connection is a planned grid connection in England, United Kingdom, with 32.6 MW of capacity, held by DNO Consulting Ltd.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | PIPPLEPEN FARM SOLAR PV grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Axminster) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | DNO Consulting Ltd | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Axminster GSP (via a grid supply point) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Pipplepen Farm Solar Park - Solar Farm (matched by name+coordinates+technology+capacity, 0.84 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 32.6 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Solar | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 29 Feb 2024 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Connection date | 5 Mar 2029 (target energisation) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 132 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 50.8586, -2.7507 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Permit granted: Pipplepen Farm Solar Park - Solar Farm (planning authority Somerset, reference 21/00701/FUL)
- Permit applied for: Pipplepen Farm Solar Park - Solar Farm (planning authority Somerset, reference 21/00701/FUL)
How it compares
Pipplepen Farm Solar PV grid connection is the 839th-largest of 2,533 grid connections in England and the 1,297th-largest of 3,903 in the United Kingdom by capacity; its 32.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 839th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 1,297th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 4,799th of 7,928 | 1,372,494 MW | <0.1% |
Timeline
Dated facts about this grid connection from its sources, oldest first.
- Entered the connection queue
- Due to connect
Nearby
Within 50 km of this grid connection: 295 power plants (143 operating, 911 MW), 42 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Pattemores Transport (Crewkern) | Power plant | 2.1 MW | Under construction | 0.8 km |
| Pipplepen Farm Solar Park - Solar Farm | Power plant | 32 MW | Permitted | 0.8 km |
| Lower Severalls Farm | Power plant | 10.8 MW | Operating | 4.8 km |
| West Hendford Primary | Substation | — | — | 12 km |
| Larkhill Primary | Substation | — | — | 12 km |
| Yetminster Primary | Substation | — | — | 13 km |
| Tata Communications Highbridge Datacentre | Data center | — | — | 44 km |
Holder, grid operator and place
More from DNO Consulting Ltd
- Row Hill Farm grid connection99.9 MW
- Parley Court Farm grid connection50 MW
- Kirkton PV + ESS grid connection43.8 MW
- Northacre Resource Recovery Plant grid connection35.5 MW
- Cordon Farm grid connection30 MW
- 10MW Cruxton Farm PV grid connection20 MW
- Motcombe Solar grid connection12 MW
- 8.55MW Battery grid connection8.55 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.