Power plant · Wiltshire, England, United Kingdom

Chicklade EV Service Station - Solar Farm

Chicklade EV Service Station - Solar Farm is a planned power plant in Wiltshire, England, United Kingdom, with 3 MW of capacity, operated by Enviromena.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth of A303, and northwest of approved EV hub, Chicklade, SP3 5STDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Feb 2026 (reference PL/2026/00795, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnviromenaDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area12.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1113, -2.1278DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Wiltshire, reference PL/2026/00795)

How it compares

Chicklade EV Service Station - Solar Farm is the 1,756th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,687th-largest of 3,222 in the United Kingdom by capacity; its 3 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,756th of 2,174185,888 MW<0.1%
United Kingdom2,687th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,853rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 224 grid connections (135 operating, 1,226 MW), 133 substations, 3 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Tisbury PrimarySubstation——6.0 km
Codford PrimarySubstation——7.9 km
Brilliant Harvest Generation grid connectionGrid connection1.76 MWOperating8.1 km
Brilliant Harvest Generation grid connectionGrid connection3.56 MWOperating8.1 km
PV Generation grid connectionGrid connection6.18 MWOperating8.1 km
Crockerton PrimarySubstation——9.3 km
Data center, England (OSM way 996865179)Data center——35 km
Ark Data CentresData center——35 km
Data Vault - Bournemouth BCP01Data center——47 km