Power plant · Wiltshire, England, United Kingdom

East Farm (Clay Pit Hill) - Extension II

East Farm (Clay Pit Hill) - Extension II is a cancelled solar power plant in Wiltshire, England, United Kingdom, with 6 MW of capacity, operated by J.M. Stratton and Co Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressClay Pit Hill Codford Down Eas, Church Lane, Codford, Warminster, BA12 0PJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Apr 2018 (reference 18/03167/FUL, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Dec 2018 (withdrawn, reference 18/03167/FUL, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorJ.M. Stratton and Co Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area17.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.1577, -2.0327DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Wiltshire, reference 18/03167/FUL)
  2. Permit applied for (planning authority Wiltshire, reference 18/03167/FUL)

How it compares

East Farm (Clay Pit Hill) - Extension II is the 2,019th-largest of 4,036 power plants in England and the 3,084th-largest of 5,837 in the United Kingdom by capacity; its 6 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,019th of 4,036134,406 MW<0.1%
United Kingdom3,084th of 5,837200,833 MW<0.1%
All power plants in our data8,851st of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 244 grid connections (144 operating, 1,359 MW), 152 substations, 7 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Brilliant Harvest Generation grid connectionGrid connection1.76 MWOperating0.4 km
Brilliant Harvest Generation grid connectionGrid connection3.56 MWOperating0.4 km
PV Generation grid connectionGrid connection6.18 MWOperating0.4 km
Codford PrimarySubstation——0.5 km
Teffont PrimarySubstation——9.1 km
Stapleford PrimarySubstation——9.4 km
Data center, England (OSM way 996865179)Data center——32 km
Ark Data CentresData center——32 km
AWS Swindon Data CentreData center——45 km

Operator and place

More from J.M. Stratton and Co Ltd

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page