Grid connection · Scotland, United Kingdom

Cordon Farm grid connection

Cordon Farm grid connection is a planned grid connection in Scotland, United Kingdom, with 30 MW of capacity, held by DNO Consulting Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCORDON FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Abernethy Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderDNO Consulting LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCordon Farm, Abernethy - Battery Storage (matched by shared name+coordinates+technology+capacity, 0.46 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toAbernethy Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity30 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyBattery storageSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date15 Sept 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.3433, -3.3272SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit applied for: Cordon Farm, Abernethy - Battery Storage (planning authority Perth and Kinross, reference 24/01558/FLM)

How it compares

Cordon Farm grid connection is the 423rd-largest of 1,192 grid connections in Scotland and the 1,333rd-largest of 3,903 in the United Kingdom by capacity; its 30 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland423rd of 1,19288,894 MW<0.1%
United Kingdom1,333rd of 3,903446,745 MW<0.1%
All grid connections in our data4,846th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 307 power plants (67 operating, 1,015 MW), 64 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Cordon Farm, Abernethy - Battery StoragePower plant30 MWPlanned0.5 km
Cordon FarmPower plant10 MWCancelled0.7 km
Carey Solar FarmPower plant10 MWCancelled0.8 km
Abernethy PrimarySubstation——2.1 km
Abernethy GSPSubstation——2.1 km
Bridge of Earn PrimarySubstation——4.7 km
Pulsant Edinburgh SC-1Data center——46 km
Pulsant Edinburgh South Gyle SC-1Data center——46 km
Lloyds Banking Group data center, ScotlandData center——46 km

Holder, grid operator and place

More from DNO Consulting Ltd

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page