Power plant · Wiltshire, England, United Kingdom

Mill Farm, Teffont - Battery Energy Storage

Mill Farm, Teffont - Battery Energy Storage is a permitted power plant in Wiltshire, England, United Kingdom, with 8.5 MW of capacity, operated by Private Energy Partners Pty Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressElectricity Sub Station 73m From Goldens 9m From Unnamed Road, Road To Mill Farm, Teffont, Salisbury, SP3 5RPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Mar 2024 (permit PL/2023/08472, Town and Country Planning Act, issued by Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Oct 2023 (reference PL/2023/08472, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Mar 2024 (granted, reference PL/2023/08472, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPrivate Energy Partners Pty LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.0784, -2.0006DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Mill Farm, Teffont - Battery Energy Storage is the 1,526th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,365th-largest of 3,222 in the United Kingdom by capacity; its 8.5 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,526th of 2,174186,088 MW<0.1%
United Kingdom2,365th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,465th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 271 grid connections (142 operating, 1,290 MW), 167 substations and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Teffont PrimarySubstation——0.2 km
8.55MW Battery grid connectionGrid connection8.55 MWPlanned0.2 km
Tisbury PrimarySubstation——6.9 km
Codford PrimarySubstation——9.0 km
Brilliant Harvest Generation grid connectionGrid connection1.76 MWOperating9.1 km
Brilliant Harvest Generation grid connectionGrid connection3.56 MWOperating9.1 km
Data Vault - Bournemouth BCP01Data center——41 km
Data center, England (OSM way 996865179)Data center——41 km
Ark Data CentresData center——41 km

Operator and place

Grid connections attached to this power plant

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page