Substation · England, United Kingdom

Teffont Primary

Teffont Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Demand headroom2.35 MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Generation headroom0 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Transformers1 x 5MVA + 1 x 6.3MVASSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LevelPrimarySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromMannington BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Fed fromSalisbury BSPSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (offtake)None (rag: Green)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Congestion (feed-in)Full (rag: Red, constraint: Upstream Thermal Capacity & Upstream Fault Level Constraint)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kV (levels kv: 33,11)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.0783, -2.0037SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Nearby

Within 50 km of this substation: 324 power plants (154 operating, 1,462 MW) and 269 grid connections (141 operating, 1,285 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Mill Farm, Teffont - Battery Energy StoragePower plant8.5 MWPermitted0.2 km
8.55MW Battery grid connectionGrid connection8.55 MWPlanned0.3 km
East Farm (Clay Pit Hill) - Extension IIPower plant6 MWCancelled9.1 km
Brilliant Harvest Generation grid connectionGrid connection1.76 MWOperating9.1 km
Brilliant Harvest Generation grid connectionGrid connection3.56 MWOperating9.1 km
Chicklade EV Service Station - Solar FarmPower plant3 MWPlanned9.4 km

Grid operator and place

Grid connections attached to this substation

More from Southern Electric Power Distribution plc

Other substations in England

All 1215 substations in England, United Kingdom

Data on this page