Dated events from official notices and registers: permits applied for, granted or refused, connection queue entries and agreements, withdrawals, construction and commissioning. Each links to the record it concerns and to the notice or register it comes from. Gas, oil and coal: 492 events, the latest on 1 Oct 2026.
By country
- The United States448 here
- The United Kingdom44 here
Latest events
| Date | Event | Concerns | Place | Source |
|---|---|---|---|---|
| 1 Oct 2026 | Entered the connection queue (10.8 MW) | Greenleaf 1 Expansion grid connection (CAISO 55203) | Sutter County, California, United States | CAISO queue report |
| 1 Oct 2026 | Entered the connection queue (40 MW) | Moss Landing CCGT Uprate grid connection (CAISO 55259) | Monterey County, California, United States | CAISO queue report |
| 1 Oct 2026 | Entered the connection queue (322 MW) | Lodi Energy Center FX grid connection (CAISO 55339) | California, United States | CAISO queue report |
| 1 Oct 2026 | Entered the connection queue (100 MW) | High Desert Power Plant Alignment grid connection (CAISO 55263) | San Bernardino County, California, United States | CAISO queue report |
| 1 Oct 2026 | Entered the connection queue (8.5 MW) | Ameresco Otay grid connection (CAISO W380) | California, United States | CAISO queue report |
| 30 Sept 2026 | Withdrawn (52 MW, natural gas, connects at Elderberry 345 kV) | PJM request AG2-562 · developer St Joseph Energy Center LLC | Indiana, United States | PJM New Services Queue |
| 30 Sept 2026 | Withdrawn (150 MW, natural gas and storage, connects at Aurora E.C. 138kV) | Aurora Battery Storage II (PJM request AH1-563) · developer Aurora Generation LLC | Illinois, United States | PJM New Services Queue |
| 30 Sept 2026 | Withdrawn (1,239 MW, natural gas, connects at Sills Road Substation 138kV, dated by the register's last update) | BECII Unit A (NYISO request C26-0047) · developer Paumanok Energy Center, LLC | New York, United States | NYISO interconnection queue |
| 30 Sept 2026 | Withdrawn (150 MW, natural gas and storage, connects at Rockford II 138 kV) | PJM request AH1-564 · developer Rockford Generation, LLC | Illinois, United States | PJM New Services Queue |
| 30 Sept 2026 | Withdrawn (40 MW, natural gas, connects at Line tap to S. Oswego-Clay LN4, near Structure No. 7,8,9, dated by the register's last update) | Opal Gas and Energy (NYISO request C26-0062) · developer Opal Products, LLC | New York, United States | NYISO interconnection queue |
| 30 Sept 2026 | Withdrawn (5 MW, natural gas, connects at University Park 138 kV) | PJM request AH1-567 · developer University Park Energy, LLC | Illinois, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (745 MW, natural gas, connects at Bloomingville - Beaver 345 kV) | PJM request C01-1624 · developer Avery Point Energy Center LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Greene - Madison 345 kV) | PJM request C01-1973 · developer Cortex Sycamore, LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (300 MW, natural gas, connects at Claysburg 115 kV) | PJM request C01-1957 · developer Cortex Sycamore, LLC | Pennsylvania, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Dumont - Greentown 765 kV) | PJM request C01-2023 · developer Cortex Sycamore, LLC | Indiana, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (605 MW, natural gas, connects at Allen Jct - Midway 345 kV) | PJM request C01-1903 · developer Metamora Energy, LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (35 MW, natural gas, connects at Red Oak 230 kV) | PJM request C01-2018 · developer Red Oak Power, LLC | New Jersey, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (300 MW, natural gas, connects at Haviland - Timber Switch 138 kV & Logtown - North Delphos 138 kV) | PJM request C01-2029 · developer Cortex Sycamore, LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (770 MW, natural gas, connects at Muskingum River - Ohio Central 345 kV) | PJM request C01-1954 · developer Cortex Sycamore, LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (950 MW, natural gas, connects at Hoytdale - Bruce Mansfield 345 kV) | PJM request C01-1956 · developer Cortex Sycamore, LLC | Pennsylvania, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Fostoria - Lemoyne 345 kV & Fostoria - Lallendorf 345 kV) | PJM request C01-1968 · developer Cortex Sycamore, LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Olive - Reynolds #1 345 kV & Olive - Ora Ora 345 kV) | PJM request C01-2032 · developer Cortex Sycamore, LLC | Indiana, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Allen - R.P. Mone 345 kV) | PJM request C01-2021 · developer Cortex Sycamore, LLC | Indiana, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Adkins - Atlanta 345 kV) | PJM request C01-1953 · developer Cortex Sycamore, LLC | Ohio, United States | PJM New Services Queue |
| 28 Sept 2026 | Withdrawn (976 MW, natural gas, connects at Greene - Madison 345 kV) | PJM request C01-1974 · developer Cortex Sycamore, LLC | Ohio, United States | PJM New Services Queue |
| 25 Sept 2026 | Withdrawn (1,200 MW, natural gas, connects at Fostoria - S Berwick 345 kV) | PJM request C01-1901 · developer Iron Triangle Energy, LLC | Ohio, United States | PJM New Services Queue |
| 25 Sept 2026 | Withdrawn (1,747 MW, natural gas, connects at Dumont - Greentown 765 kV) | PJM request C01-1904 · developer Anchorpoint Energy, LLC | Indiana, United States | PJM New Services Queue |
| 25 Sept 2026 | Withdrawn (510 MW, natural gas, connects at Talbert - Hawkins Gate 230 kV & Talbert to Morgantown 230 kV) | PJM request C01-1338 · developer Old Line Reserve Energy, LLC | Maryland, United States | PJM New Services Queue |
| 24 Sept 2026 | Withdrawn (520 MW, natural gas, connects at AXTON 765 kV) | PJM request C01-1714 · developer STACK Danville Gen Power 3, LLC | Virginia, United States | PJM New Services Queue |
| 24 Sept 2026 | Withdrawn (1,496 MW, natural gas, connects at Indian River 230 kV) | PJM request C01-1130 · developer NRG Indian River Energy Center LLC | Delaware, United States | PJM New Services Queue |
| 24 Sept 2026 | Withdrawn (650 MW, natural gas, connects at AXTON 765 kV) | PJM request C01-2109 · developer STACK Danville Gen Power 1, LLC | Virginia, United States | PJM New Services Queue |
| 24 Sept 2026 | Withdrawn (650 MW, natural gas, connects at AXTON 765 kV) | PJM request C01-2110 · developer STACK Danville Gen Power 2, LLC | Virginia, United States | PJM New Services Queue |
| 18 Sept 2026 | Entered the connection queue (495 MW, the day the screening study started) | Black Mountain Briscoe Gas grid connection (ERCOT 29INR0397) | Briscoe County, Texas, United States | ERCOT GIS report |
| 17 Sept 2026 | Withdrawn (1,300 MW, natural gas, connects at Lordstown - Wellsville 345 kV) | PJM request C01-1474 · developer West Field Energy Center LLC | Ohio, United States | PJM New Services Queue |
| 8 Sept 2026 | Entered the connection queue (627 MW) | EF Barrett - 2 grid connection (NYISO C26-0053) | Nassau County, New York, United States | NYISO interconnection queue |
| 4 Sept 2026 | Entered the connection queue (780 MW, the day the screening study started) | Blue Energy Center- Phase 1a - Gas grid connection (ERCOT 30INR0150) | Victoria County, Texas, United States | ERCOT GIS report |
| 4 Sept 2026 | Entered the connection queue (1,174 MW, the day the screening study started) | Wolf Bone North Energy Center grid connection (ERCOT 29INR0354) | Reeves County, Texas, United States | ERCOT GIS report |
| 4 Sept 2026 | Entered the connection queue (448 MW) | Gowanus Gas Turbine Facility Repowering grid connection (NYISO C26-0051) | Kings County, New York, United States | NYISO interconnection queue |
| 31 Aug 2026 | Withdrawn (109 MW, natural gas, connects at Bay Shore 138 kV) | PJM request C01-1948 · developer Walleye Power, LLC | Ohio, United States | PJM New Services Queue |
| 25 Aug 2026 | Entered the connection queue (350 MW) | Patriot Forge Energy Center grid connection (NYISO C26-0029-2) | Tioga County, Pennsylvania, United States | NYISO interconnection queue |
| 20 Aug 2026 | Entered the connection queue (427 MW) | Northport Power Station grid connection (NYISO C26-0028) | Suffolk County, New York, United States | NYISO interconnection queue |
| 18 Aug 2026 | Entered the connection queue (427 MW) | EF Barrett - 1 grid connection (NYISO C26-0027) | Nassau County, New York, United States | NYISO interconnection queue |
| 17 Aug 2026 | Entered the connection queue (105 MW, the day the screening study started) | Power Lane II - Gas grid connection (ERCOT 27INR0631) | Hunt County, Texas, United States | ERCOT GIS report |
| 11 Aug 2026 | Entered the connection queue (1,026 MW, the day the screening study started) | H&C Wilbarger Power II grid connection (ERCOT 32INR0008) | Wilbarger County, Texas, United States | ERCOT GIS report |
| 11 Aug 2026 | Entered the connection queue (1,026 MW, the day the screening study started) | H&C Wilbarger Power I grid connection (ERCOT 32INR0006) | Wilbarger County, Texas, United States | ERCOT GIS report |
| 3 Aug 2026 | Withdrawn (35 MW, natural gas, connects at Burches Hill 230 kV) | PJM request C01-2150 · developer KMC Thermo, LLC | Maryland, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (coal, connects at Ridgeley 138 kV) | PJM request C01-1011 · developer AES WR Limited Partnership | United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (50 MW, natural gas, connects at Sunbury 500 kV) | PJM request C01-2005 · developer Hummel Station, LLC | Pennsylvania, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (750 MW, fuel cell and natural gas and nuclear, connects at LadySmith - Possum Point 500 kV) | PJM request C01-1735 · developer Oklo Power LLC | Virginia, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (10 MW, natural gas, connects at Trumbull 345 kV) | PJM request C01-1042 · developer Clean Energy Future - Trumbull, LLC. | Ohio, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (750 MW, natural gas, connects at Columbia - Frackville 230 kV) | PJM request C01-1196 · developer Invitium Energy, LLC | Pennsylvania, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (750 MW, natural gas, connects at Sunbury (SUNB) - Susquehanna (SUSQ) 230 kV) | PJM request C01-1191 · developer Invitium Energy, LLC | Pennsylvania, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (500 MW, natural gas, connects at Hoytdale - McClelland 345 kV & Hoytdale - Bruce Mansfield 345 kV) | PJM request C01-2207 · developer Switch | Pennsylvania, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (725 MW, natural gas, connects at Flint Run 500 kV) | PJM request C01-1563 · developer CPV Shay, LLC | West Virginia, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (506 MW, natural gas, connects at Flatlick 765 kV) | PJM request C01-2045 · developer Rolling Hills Generating LLC | Ohio, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (750 MW, natural gas, connects at Eldred 230 kV) | PJM request C01-1198 · developer Invitium Energy, LLC | Pennsylvania, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (809 MW, natural gas, connects at South Butler 345 kV) | PJM request C01-2254 · developer Peregrine Generation, LLC | Indiana, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (375 MW, natural gas and nuclear, connects at Siegfried - Harwood 230 kV) | PJM request C01-1736 · developer Oklo Power LLC | Pennsylvania, United States | PJM New Services Queue |
| 31 Jul 2026 | Entered the connection queue (624 MW) | Evergreen Ridge Power grid connection (NYISO C26-0001-1) | Tioga County, Pennsylvania, United States | NYISO interconnection queue |
| 10 Jul 2026 | Entered the connection queue (400 MW, the day the screening study started) | Alpha Power Phase 4 grid connection (ERCOT 31INR0025) | Guadalupe County, Texas, United States | ERCOT GIS report |
| 10 Jul 2026 | Entered the connection queue (400 MW, the day the screening study started) | Alpha Power Phase 2 grid connection (ERCOT 29INR0363) | Guadalupe County, Texas, United States | ERCOT GIS report |
| 10 Jul 2026 | Entered the connection queue (400 MW, the day the screening study started) | Alpha Power Phase 3 grid connection (ERCOT 30INR0143) | Guadalupe County, Texas, United States | ERCOT GIS report |
| 10 Jul 2026 | Entered the connection queue (400 MW, the day the screening study started) | Alpha Power Phase 1 grid connection (ERCOT 28INR0532) | Guadalupe County, Texas, United States | ERCOT GIS report |
| 10 Jul 2026 | Entered the connection queue (400 MW, the day the screening study started) | Alpha Power Phase 5 grid connection (ERCOT 32INR0007) | Guadalupe County, Texas, United States | ERCOT GIS report |
| 8 Jul 2026 | Entered the connection queue (1,273 MW, the day the screening study started) | Thunder Bird 1 Gas grid connection (ERCOT 30INR0110) | Jack County, Texas, United States | ERCOT GIS report |
| 8 Jul 2026 | Entered the connection queue (466 MW, the day the screening study started) | Victory Ellis – Gas grid connection (ERCOT 29INR0264) | Ellis County, Texas, United States | ERCOT GIS report |
| 6 Jul 2026 | Entered the connection queue (378 MW, the day the screening study started) | Digital Ranch Gas grid connection (ERCOT 28INR0100) | Ellis County, Texas, United States | ERCOT GIS report |
| 6 Jul 2026 | Entered the connection queue (the day the screening study started) | Three Canes Gas P1 grid connection (ERCOT 27INR0651) | Freestone County, Texas, United States | ERCOT GIS report |
| 6 Jul 2026 | Entered the connection queue (350 MW, the day the screening study started) | Cielo Vista Power II grid connection (ERCOT 28INR0497) | Duval County, Texas, United States | ERCOT GIS report |
| 6 Jul 2026 | Entered the connection queue (the day the screening study started) | Three Canes Gas P2 grid connection (ERCOT 27INR0652) | Freestone County, Texas, United States | ERCOT GIS report |
| 29 Jun 2026 | Entered the connection queue (1,275 MW, the day the screening study started) | Aurelius 3 Natural Gas grid connection (ERCOT 29INR0361) | Deaf Smith County, Texas, United States | ERCOT GIS report |
| 25 Jun 2026 | Entered the connection queue (523 MW, the day the screening study started) | Rock House Draw Gas grid connection (ERCOT 27INR0653) | Pecos County, Texas, United States | ERCOT GIS report |
| 24 Jun 2026 | Entered the connection queue (251 MW, the day the screening study started) | Pampa Natural Gas grid connection (ERCOT 29INR0341) | Roberts County, Texas, United States | ERCOT GIS report |
| 24 Jun 2026 | Entered the connection queue (250 MW, the day the screening study started) | Anawa La Gas grid connection (ERCOT 28INR0524) | Hidalgo County, Texas, United States | ERCOT GIS report |
| 24 Jun 2026 | Entered the connection queue (450 MW, the day the screening study started) | Bobcat Generating Station grid connection (ERCOT 29INR0340) | Caldwell County, Texas, United States | ERCOT GIS report |
| 12 Jun 2026 | Entered the connection queue (1,022 MW, the day the screening study started) | Wickson Creek Gas grid connection (ERCOT 28INR0530) | Brazos County, Texas, United States | ERCOT GIS report |
| 12 Jun 2026 | Entered the connection queue (1,400 MW, the day the screening study started) | Bullock Gas grid connection (ERCOT 33INR0005) | Hill County, Texas, United States | ERCOT GIS report |
| 12 Jun 2026 | Entered the connection queue (1,400 MW, the day the screening study started) | Liberty Thermal Energy Center grid connection (ERCOT 33INR0006) | Hill County, Texas, United States | ERCOT GIS report |
| 4 Jun 2026 | Entered the connection queue (1,263 MW, the day the screening study started) | Mule Deer Run Gas II grid connection (ERCOT 31INR0021) | Anderson County, Texas, United States | ERCOT GIS report |
| 4 Jun 2026 | Entered the connection queue (1,263 MW, the day the screening study started) | Mule Deer Run Gas III grid connection (ERCOT 31INR0022) | Anderson County, Texas, United States | ERCOT GIS report |
| 4 Jun 2026 | Entered the connection queue (991 MW, the day the screening study started) | Black Mountain Fannin Gas grid connection (ERCOT 29INR0191) | Fannin County, Texas, United States | ERCOT GIS report |
| 26 May 2026 | Entered the connection queue (1,273 MW, the day the screening study started) | Thunder Bird 2 Gas grid connection (ERCOT 28INR0509) | Jack County, Texas, United States | ERCOT GIS report |
| 13 May 2026 | Entered the connection queue (398 MW, the day the screening study started) | Tyler Rose Power Plant 2 grid connection (ERCOT 29INR0336) | Grimes County, Texas, United States | ERCOT GIS report |
| 13 May 2026 | Entered the connection queue (597 MW, the day the screening study started) | Tyler Rose Power Plant 1 grid connection (ERCOT 29INR0333) | Grimes County, Texas, United States | ERCOT GIS report |
| 11 May 2026 | Entered the connection queue (600 MW, the day the screening study started) | Longleaf II Power Station grid connection (ERCOT 30INR0114) | Angelina County, Texas, United States | ERCOT GIS report |
| 11 May 2026 | Entered the connection queue (1,026 MW, the day the screening study started) | Trailblazer Natural Gas Generation Plant grid connection (ERCOT 27INR0575) | Nolan County, Texas, United States | ERCOT GIS report |
| 8 May 2026 | Entered the connection queue (1,300 MW, the day the screening study started) | The Giant Arc I grid connection (ERCOT 30INR0113) | Pecos County, Texas, United States | ERCOT GIS report |
| 28 Apr 2026 | Entered the connection queue (58.3 MW, the day the screening study started) | Alpha Digital Campus Combined-cycle and Co-located Load grid connection (ERCOT 28INR0499) | Reeves County, Texas, United States | ERCOT GIS report |
| 27 Apr 2026 | Entered the connection queue (382 MW) | Nottingham (05NOTTINGH34) 138 kV grid connection (PJM C01-1674) | Harrison County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (1,000 MW) | Collier - Tidd 345 kV grid connection (PJM C01-1168) | Brooke County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (850 MW) | Sammis - Star 345 kV grid connection (PJM C01-2121) | Jefferson County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (1,365 MW) | Lackawanna - Hopatcong 500 kV grid connection (PJM C01-2229) | Wayne County, Pennsylvania, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (382 MW) | Nottingham 138 kV grid connection (PJM C01-1720) | Harrison County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (28 MW) | Rhodes Lane 500 kV grid connection (PJM C01-1267) | Westmoreland County, Pennsylvania, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (1,300 MW) | Hatfield - Rhodes Lane 500 kV grid connection (PJM C01-1763) | Fayette County, Pennsylvania, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (850 MW) | Sammis - Star 345 kV grid connection (PJM C01-2114) | Jefferson County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (1,490 MW) | Harrison - Wylie Ridge 500 kV grid connection (PJM C01-1585) | Monongalia County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (1,486 MW) | Susquehanna - Mountain 230 kV & Susquehanna T10 - Mountain 230 kV grid connection (PJM C01-1592) | Luzerne County, Pennsylvania, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (22.2 MW) | Lordstown 345 kV grid connection (PJM C01-1491) | Trumbull County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (102 MW) | Parlin 230 kV grid connection (PJM C01-1075) | Middlesex County, New Jersey, United States | PJM New Services Queue |
Follow these events in a feed reader: Atom feed.
How the stream is built
Every day the collectors fetch the registers again. A notice or register row with a date becomes an event, typed by rules on the register's own codes and words (no language model reads the notices). Where a register shows only the current status, a change between two fetches is dated the day it was first seen, and says so. Every public event is also in the open data download, with its source and licence.
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.