Transmission line · Bassetlaw, England, United Kingdom

North Humber to High Marnham

North Humber to High Marnham is a planned transmission line in Bassetlaw, England, United Kingdom, operated by National Grid Electricity Transmission plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBassetlaw (coordinates), England (region: Yorkshire and the Humber)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (Acceptance)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Oct 2026 (reference: EN020034, authority: The Planning Inspectorate)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNational Grid Electricity Transmission plc (role: applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Voltage400 kVPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area1,618 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.4587, -0.8654Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this transmission line, or want an introduction to its operator? Ask us.

How it compares by area

North Humber to High Marnham is the 14th-largest of 22 transmission lines in England and the 16th-largest of 27 in the United Kingdom by area, with 1,618 ha. It reports no undefined, so it is ranked by area among the transmission lines in our data that report one, whatever their status. Areas of shared titles overlap, so they are not added up.

WithinRank
England14th of 22
United Kingdom16th of 27

How its operator compares

National Grid Electricity Transmission plc operates 12 of the 31 transmission lines in the United Kingdom in our data with a named owner; the most of any owner. Counts cover the transmission lines in our data that name an owner, holder or operator; an asset with several owners counts for each.

Operator in United KingdomRankTransmission linesShare
National Grid Electricity Transmission plc1st1239%
National Grid2nd516%
SP Manweb3rd39.7%
Aquind Limited4th13.2%
Green Gen Cymru4th13.2%

Nearby

Within 50 km of this transmission line: 561 power plants (164 operating, 4,789 MW), 497 grid connections (173 operating, 2,417 MW) and 217 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
HaxeySubstation——4.6 km
Everton Carr Wind FarmPower plant—Planned4.7 km
Old Trent Road, Beckingham - Battery Storage FacilityPower plant80 MWCancelled7.1 km
Misson Solar FarmPower plant5 MWOperating7.6 km
EpworthSubstation——8.1 km
Austerfield, Bawtry Road, Norwith Farm, Misson Solar Farm grid connectionGrid connection——8.2 km
Land at Harwill Farm grid connectionGrid connection——8.5 km
AusterfieldSubstation——9.2 km
Battery storage and Solar 40 MW grid connection at Bawtry SolarGrid connection40 MWPlanned9.9 km