Event stream · Wind
Wind: latest changes
Dated events from official notices and registers: permits applied for, granted or refused, connection queue entries and agreements, withdrawals, construction and commissioning. Each links to the record it concerns and to the notice or register it comes from. Wind: 6,037 events, the latest on 23 Oct 2026.
By country
- The Netherlands142 here
- The United States436 here
- Mexico4 here
- The United Kingdom5,455 here
Latest events
| Date | Event | Concerns | Place | Source |
|---|---|---|---|---|
| 23 Oct 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Bladel (gmb-2026-495188) | Bladel, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 16 Oct 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Hollands Kroon (gmb-2026-485054) | Hollands Kroon, North Holland, Netherlands | Officiële Bekendmakingen · notice |
| 15 Oct 2026 | Withdrawn (78.7 MW, wind, connects at Kewanee-Streator) | Hickory Wind (PJM request AC1-168) · PJM Interconnection, L.L.C. | Illinois, United States | PJM New Services Queue |
| 13 Oct 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Súdwest-Fryslân (gmb-2026-476994) | Súdwest-Fryslân, Friesland, Netherlands | Officiële Bekendmakingen · notice |
| 7 Oct 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Midden-Groningen (gmb-2026-467264) | Midden-Groningen, Groningen, Netherlands | Officiële Bekendmakingen · notice |
| 6 Oct 2026 | Permit applied for (zoning plan) | Wind omgevingsplan application, Schagen (gmb-2026-466592) | Schagen, North Holland, Netherlands | Officiële Bekendmakingen · notice |
| 1 Oct 2026 | Entered the connection queue (300 MW) | Energia Sierra Juarez 5 grid connection (CAISO 55338) | Mexico | CAISO queue report |
| 1 Oct 2026 | Entered the connection queue (295 MW) | Lobo Wind grid connection (CAISO 55371) | Torrance County, New Mexico, United States | CAISO queue report |
| 30 Sept 2026 | Withdrawn (20 MW, wind, connects at Madera - Westover South 115 kV) | PJM request AH1-746 · developer CPV Rogue's Wind, LLC | Pennsylvania, United States | PJM New Services Queue |
| 30 Sept 2026 | Withdrawn (380 MW, wind, connects at Willis-Haverstock 345kV HW1, dated by the register's last update) | North Country Wind II (NYISO request C26-0012) · developer NY North Country, LLC | New York, United States | NYISO interconnection queue |
| 30 Sept 2026 | Entered the connection queue (294 MW, the day the screening study started) | Rugged Prairie Wind grid connection (ERCOT 29INR0399) | Fisher County, Texas, United States | ERCOT GIS report |
| 30 Sept 2026 | Withdrawn (200 MW, wind, connects at Line tap on the Lafayette - Clarks Corner 345 kV transmission line, dated by the register's last update) | Cortland Wind (NYISO request C26-0031) · developer RWE Solar Development, LLC | New York, United States | NYISO interconnection queue |
| 30 Sept 2026 | Withdrawn (380 MW, wind, connects at Willis 230kV substation, dated by the register's last update) | North Country Wind (NYISO request C26-0011) · developer NY North Country, LLC | New York, United States | NYISO interconnection queue |
| 30 Sept 2026 | Withdrawn (200 MW, wind, connects at Coopers Corners to Marcy 345 kV, dated by the register's last update) | Downsville Wind (NYISO request C26-0032) · developer RWE Solar Development, LLC | New York, United States | NYISO interconnection queue |
| 29 Sept 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Schagen (gmb-2026-453932) | Schagen, North Holland, Netherlands | Officiële Bekendmakingen · notice |
| 28 Sept 2026 | Withdrawn (69 MW, wind, connects at Point Lookout 69 kV) | PJM request C01-1342 · developer Fiddlers Ridge Energy, LLC | Virginia, United States | PJM New Services Queue |
| 24 Sept 2026 | Withdrawn (37.7 MW, wind, connects at Marshall 230 kV) | PJM request C01-1036 · developer Laurel Hill Wind Energy, LLC | Pennsylvania, United States | PJM New Services Queue |
| 23 Sept 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Almere (gmb-2026-446368) | Almere, Flevoland, Netherlands | Officiële Bekendmakingen · notice |
| 16 Sept 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Midden-Drenthe (gmb-2026-435078) | Midden-Drenthe, Drenthe, Netherlands | Officiële Bekendmakingen · notice |
| 10 Sept 2026 | Entered the connection queue (407 MW, the day the screening study started) | Horizon Ridge Wind grid connection (ERCOT 30INR0128) | Winkler County, Texas, United States | ERCOT GIS report |
| 7 Sept 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Zeewolde (gmb-2026-418953) | Zeewolde, Flevoland, Netherlands | Officiële Bekendmakingen · notice |
| 7 Sept 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Zeewolde (gmb-2026-418606) | Zeewolde, Flevoland, Netherlands | Officiële Bekendmakingen · notice |
| 4 Sept 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Tholen (gmb-2026-417814) | Tholen, Zeeland, Netherlands | Officiële Bekendmakingen · notice |
| 26 Aug 2026 | Withdrawn (300 MW, wind, connects at Erie West - Ashtabula 345 kV) | PJM request C01-1871 · developer Station Wind, LLC | Ohio, United States | PJM New Services Queue |
| 26 Aug 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Reusel-De Mierden (prb-2026-14495) | Reusel-De Mierden, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 7 Aug 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Westland (gmb-2026-378275) | Westland, South Holland, Netherlands | Officiële Bekendmakingen · notice |
| 3 Aug 2026 | Withdrawn (400 MW, wind, connects at Essex (AD1-100) - Loretto 345 kV) | PJM request C01-2175 · developer Sabine Energy Development, LLC | Illinois, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (175 MW, wind, connects at North Franklin 138 kV) | PJM request C01-1726 · developer Renew Development HoldCo LLC | West Virginia, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (165 MW, wind, connects at Indian River 230 kV) | PJM request C01-1365 · developer US Wind Inc. | Delaware, United States | PJM New Services Queue |
| 3 Aug 2026 | Withdrawn (98 MW, wind, connects at Powerton - Goodings Grove 345 kV) | PJM request C01-1705 · developer RWE Clean Energy Development, LLC | Illinois, United States | PJM New Services Queue |
| 31 Jul 2026 | Entered the connection queue (199 MW) | Seventy Seven Wind grid connection (NYISO C26-0005) | Wyoming County, New York, United States | NYISO interconnection queue |
| 31 Jul 2026 | Entered the connection queue (150 MW) | Salt Rush Wind grid connection (NYISO C26-0007) | Wyoming County, New York, United States | NYISO interconnection queue |
| 31 Jul 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Noord-Holland (prb-2026-13044) | North Holland, Netherlands | Officiële Bekendmakingen · notice |
| 31 Jul 2026 | Entered the connection queue (185 MW) | Rolling Hills Wind grid connection (NYISO C26-0014) | Herkimer County, New York, United States | NYISO interconnection queue |
| 24 Jul 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Bladel (gmb-2026-356155) | Bladel, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 22 Jul 2026 | Entered the connection queue (508 MW, the day the screening study started) | Pecos Flats Wind II grid connection (ERCOT 30INR0132) | Pecos County, Texas, United States | ERCOT GIS report |
| 22 Jul 2026 | Entered the connection queue (507 MW, the day the screening study started) | Pecos Flats Wind I grid connection (ERCOT 30INR0131) | Pecos County, Texas, United States | ERCOT GIS report |
| 22 Jul 2026 | Entered the connection queue (350 MW, the day the screening study started) | Oasis wind grid connection (ERCOT 29INR0073) | Crockett County, Texas, United States | ERCOT GIS report |
| 22 Jul 2026 | Entered the connection queue (395 MW, the day the screening study started) | Blue Sage Wind grid connection (ERCOT 30INR0135) | Andrews County, Texas, United States | ERCOT GIS report |
| 16 Jul 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Reusel-De Mierden (gmb-2026-340706) | Reusel-De Mierden, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 15 Jul 2026 | Permit applied for (nature permit) | Wind natuurvergunning application, Schouwen-Duiveland (prb-2026-11913) | Schouwen-Duiveland, Zeeland, Netherlands | Officiële Bekendmakingen · notice |
| 8 Jul 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Schouwen-Duiveland (gmb-2026-325273) | Schouwen-Duiveland, Zeeland, Netherlands | Officiële Bekendmakingen · notice |
| 6 Jul 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Zeewolde (gmb-2026-320025) | Zeewolde, Flevoland, Netherlands | Officiële Bekendmakingen · notice |
| 3 Jul 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Bladel (gmb-2026-317018) | Bladel, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 2 Jul 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Groningen (gmb-2026-314800) | Groningen, Groningen, Netherlands | Officiële Bekendmakingen · notice |
| 29 Jun 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Hollands Kroon (gmb-2026-308062) | Hollands Kroon, North Holland, Netherlands | Officiële Bekendmakingen · notice |
| 25 Jun 2026 | Permit applied for (2,000 MW, planning authority Marine Scotland) | Machair | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 19 Jun 2026 | Withdrawn (400 MW, wind, connects at Suncrest - Ocotillo 500 kV Line, register status “WITHDRAWN: Failure to Cure Deficiency”) | Mount Laguna Wind 2 (CAISO request 1429) · California Independent System Operator Corporation | California, United States | CAISO queue report |
| 19 Jun 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Midden-Drenthe (gmb-2026-292628) | Midden-Drenthe, Drenthe, Netherlands | Officiële Bekendmakingen · notice |
| 18 Jun 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Waterland (gmb-2026-288513) | Waterland, North Holland, Netherlands | Officiële Bekendmakingen · notice |
| 18 Jun 2026 | Permit granted (nature permit) | Wind natuurvergunning decision, Utrecht (gmb-2026-291556) | Utrecht, Utrecht, Netherlands | Officiële Bekendmakingen · notice |
| 16 Jun 2026 | Permit applied for (zoning plan) | Wind omgevingsplan application, West Betuwe (gmb-2026-281812) | West Betuwe, Gelderland, Netherlands | Officiële Bekendmakingen · notice |
| 1 Jun 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Utrecht (gmb-2026-253113) | Utrecht, Utrecht, Netherlands | Officiële Bekendmakingen · notice |
| 1 Jun 2026 | Permit applied for (environmental permit) | Wind omgevingsvergunning application, Groningen (gmb-2026-255721) | Groningen, Groningen, Netherlands | Officiële Bekendmakingen · notice |
| 1 Jun 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Utrecht (gmb-2026-255566) | Utrecht, Utrecht, Netherlands | Officiële Bekendmakingen · notice |
| 31 May 2026 | Withdrawn (101 MW, wind, connects at E. Norwich - Jennison 115kV, dated by the register's last update) | High Bridge Wind (NYISO request 0706) · developer High Bridge Wind, LLC | New York, United States | NYISO interconnection queue |
| 21 May 2026 | Plan adopted (zoning plan) | Wind omgevingsplan decision, Nieuwkoop (gmb-2026-241061) | Nieuwkoop, South Holland, Netherlands | Officiële Bekendmakingen · notice |
| 21 May 2026 | Draft decision (environmental permit) | Wind omgevingsvergunning draft decision, Amersfoort (gmb-2026-242252) | Amersfoort, Utrecht, Netherlands | Officiële Bekendmakingen · notice |
| 20 May 2026 | Permit applied for (1,450 MW, planning authority Marine Scotland) | Morven North Offshore Wind Farm | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 20 May 2026 | Permit applied for (1,450 MW, planning authority Marine Scotland) | Morven South Offshore Wind Farm | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 15 May 2026 | Permit applied for (8.2 MW, planning authority Central Bedfordshire, reference CB/26/01392/OUT) | Eastern Way | Central Bedfordshire, England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 15 May 2026 | Permit applied for (50.4 MW, planning authority Scottish Government (S36), reference ECU00005159) | High Mark Wind Farm - Wind Turbines | Dumfries and Galloway, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (1,500 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010125) | Dogger Bank South West | England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (planning authority The Planning Inspectorate, reference EN010119) | North Falls Offshore Wind Farm | England, United Kingdom | Planning Inspectorate: National Infrastructure Projects · record |
| 14 May 2026 | Permit granted (1,000 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010119) | North Falls Offshore Wind Farm | England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 14 May 2026 | Permit granted (1,500 MW, planning authority The Planning Inspectorate - National Infrastructure, reference EN010125) | Dogger Bank South East | England, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 13 May 2026 | Commissioned (140 MW, register status “Partially in Service - Under Construction”) | Grover Hill Wind Project grid connection (PJM AE1-245) | Paulding County, Ohio, United States | PJM New Services Queue |
| 11 May 2026 | Entered the connection queue (302 MW, the day the screening study started) | Montgomery Ranch 2 Wind grid connection (ERCOT 29INR0326) | Foard County, Texas, United States | ERCOT GIS report |
| 7 May 2026 | Permit applied for (24.8 MW, planning authority Dumfries and Galloway, reference 26/0744/FUL) | West Scales Energy Park | Dumfries and Galloway, Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 6 May 2026 | Permit applied for (1,000 MW, planning authority Marine Scotland) | Cluaran Ear-Thuath / Bowdun Wind Farm (Thistle North East) (E3) | Scotland, United Kingdom | DESNZ Renewable Energy Planning Database (REPD) |
| 5 May 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Reusel-De Mierden (prb-2026-7548) | Reusel-De Mierden, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 28 Apr 2026 | Permit granted (environmental permit) | Wind omgevingsvergunning decision, Gilze en Rijen (gmb-2026-200495) | Gilze en Rijen, North Brabant, Netherlands | Officiële Bekendmakingen · notice |
| 27 Apr 2026 | Entered the connection queue (350 MW) | Mount Storm - Pruntytown 500 kV grid connection (PJM C01-1725) | Preston County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (46.6 MW) | Lincoln - Sterling 138 kV grid connection (PJM C01-1420) | Paulding County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (53.9 MW) | Meadow Lake 345 kV grid connection (PJM C01-1426) | White County, Indiana, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (20 MW) | Garden Plain 138 kV grid connection (PJM C01-1588) | Whiteside County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (53.5 MW) | Meadow Lake 345 kV grid connection (PJM C01-1428) | White County, Indiana, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (103 MW) | Davis Besse - Beaver 345 kV grid connection (PJM C01-1258) | Erie County, Ohio, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (96 MW) | Katydid Road 345 kV grid connection (PJM C01-1422) | Livingston County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (12.9 MW) | Statler Hill 115 kV grid connection (PJM C01-1807) | Somerset County, Pennsylvania, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (36.5 MW) | GR Ridge ; B 138 kV grid connection (PJM C01-1177) | La Salle County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (135 MW) | Olive - Cook 345 kV grid connection (PJM C01-2196) | Berrien County, Michigan, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (98.7 MW) | Twin Grove 345 kV grid connection (PJM C01-1867) | McLean County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (300 MW) | Byron - Wempletown 345 kV grid connection (PJM C01-2255) | Ogle County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (56.4 MW) | Pembroke Creek 230 kV grid connection (PJM C01-1764) | Chowan County, North Carolina, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (49.1 MW) | Katydid Road 345 kV grid connection (PJM C01-1423) | Livingston County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (135 MW) | Olive - Cook 345 kV grid connection (PJM C01-2195) | Berrien County, Michigan, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (126 MW) | Greenland Gap 500 kV grid connection (PJM C01-1806) | Grant County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (52.9 MW) | Leadsville 138 kV grid connection (PJM C01-2211) | Randolph County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (30.8 MW) | Jay 138 kV grid connection (PJM C01-1593) | Jay County, Indiana, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (103 MW) | Meadow Lake 345 kV grid connection (PJM C01-1430) | White County, Indiana, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (300 MW) | Byron - Wayne 345 kV grid connection (PJM C01-1967) | De Kalb County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (38 MW) | Meadow Brook - Greenland Gap 500 kV grid connection (PJM C01-1237) | Hampshire County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (32 MW) | Low Moor - Lexington 230 kV grid connection (PJM C01-1232) | Botetourt County, Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (300 MW) | Wempletown - Cherry Valley 345 kV grid connection (PJM C01-1771) | Boone County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (150 MW) | Comed McLean Subtation 345 kV grid connection (PJM C01-1389) | McLean County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (102 MW) | Desoto - Tanners Creek 345 kV grid connection (PJM C01-1418) | Randolph County, Indiana, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (58.7 MW) | William 138 kV grid connection (PJM C01-1733) | Tucker County, West Virginia, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (150 MW) | TSS 905 Essex 345 kV grid connection (PJM C01-1567) | Kankakee County, Illinois, United States | PJM New Services Queue |
| 27 Apr 2026 | Entered the connection queue (278 MW) | Pickens - Monterville 138 kV grid connection (PJM C01-2095) | Randolph County, West Virginia, United States | PJM New Services Queue |
Follow these events in a feed reader: Atom feed.
How the stream is built
Every day the collectors fetch the registers again. A notice or register row with a date becomes an event, typed by rules on the register's own codes and words (no language model reads the notices). Where a register shows only the current status, a change between two fetches is dated the day it was first seen, and says so. Every public event is also in the open data download, with its source and licence.
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.