Power plant · Cardiff, Wales, United Kingdom

Principality Stadium, Westgate Street - Solar panels

Principality Stadium, Westgate Street - Solar panels is a solar power plant in Cardiff, Wales, United Kingdom, with 1.49 MW of capacity, operated by Millennium Stadium plc.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCardiff (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWestgate Street, Cathays, Cardiff, CF10 1NSDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2026DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Sept 2025 (permit 25/01917/CLPUD, Town and Country Planning Act, issued by Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Aug 2025 (reference 25/01917/CLPUD, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Sept 2025 (granted, reference 25/01917/CLPUD, planning authority Cardiff)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMillennium Stadium plcDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.49 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4787, -3.1801DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Cardiff, reference 25/01917/CLPUD)
  3. Permit applied for (planning authority Cardiff, reference 25/01917/CLPUD)

How it compares

Principality Stadium, Westgate Street - Solar panels is the 237th-largest of 249 power plants in Wales and the 2,689th-largest of 2,942 in the United Kingdom by capacity; its 1.49 MW is <0.1% of the 105,383 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales237th of 24910,492 MW<0.1%
United Kingdom2,689th of 2,942105,383 MW<0.1%
All power plants in our data11,615th of 12,2301,691,896 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 9 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Microsoft Newport data centreData center——13 km
Centerprise International NewportData center——13 km
Vantage Data Centers data center, NewportData center——13 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned28 km
Hinkley Point C ConnectionTransmission line—Permitted32 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating49 km

Operator and place

Other power plants in Wales

All 622 power plants in Wales, United Kingdom

Data on this page