Power plant · North Kesteven, England, United Kingdom
Ferry Lane, Skellingthorpe - Solar Panels
Ferry Lane, Skellingthorpe - Solar Panels is a permitted power plant in North Kesteven, England, United Kingdom, with 20.2 MW of capacity, operated by PS Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Kesteven (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | North Of Ferry Lane North-East Of Skellingthorpe & West Of Burton Waters, LN6 5TX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 14 May 2026 (permit 25/0521/FUL, Town and Country Planning Act, issued by North Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 8 May 2025 (reference 25/0521/FUL, planning authority North Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 14 May 2026 (granted, reference 25/0521/FUL, planning authority North Kesteven) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | PS Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 20.2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 34.8 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.2410, -0.6034 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Ferry Lane, Skellingthorpe - Solar Panels is the 1,198th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,873rd-largest of 3,222 in the United Kingdom by capacity; its 20.2 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,198th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,873rd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,865th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 336 grid connections (66 operating, 1,101 MW), 70 substations, 3 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Skellingthorpe Solar Farm grid connection | Grid connection | — | — | 1.4 km |
| Doddington Road grid connection | Grid connection | — | — | 4.0 km |
| Lincoln Sadler Road grid connection | Grid connection | — | — | 4.1 km |
| Stow | Substation | — | — | 11 km |
| Harpswell | Substation | — | — | 18 km |
| Normanby | Substation | — | — | 18 km |
| Digital Space DC - Newark | Data center | — | — | 22 km |
| North Humber to High Marnham | Transmission line | — | Planned | 30 km |
| Triton Knoll Electrical System | Transmission line | — | Permitted | 43 km |
Operator and place
More from PS Renewables
- One Earth Solar Farm740 MW · permitted
- Eveley Farm49 MW
- Side Barn, Church Lane - Solar Farm24 MW · permitted
- Sand Lane Solar Farm20.2 MW · planned
- Cross Rein Bank Solar Farm - Solar Farm19 MW · planned
- Cox's Brook Solar Farm - Solar Array16 MW · permitted
- Skye Green Solar Farm15 MW · permitted
- Brookthorpe Solar Farm8 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.