Power plant · Cheshire West and Chester, England, United Kingdom

Chads Farm - Photovoltaic Arrays & Battery Storage

Chads Farm - Photovoltaic Arrays & Battery Storage is a planned solar power plant in Cheshire West and Chester, England, United Kingdom, with 15 MW of capacity, operated by Renewable Connections Developments Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCheshire West and Chester (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressChads Farm, Barhill Drive, Tushingham, Whitchurch, SY13 4QUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Feb 2022 (reference 22/00224/FUL, planning authority Cheshire West and Chester)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable Connections Developments Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area38.4 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0175, -2.6951DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Cheshire West and Chester, reference 22/00224/FUL)

How it compares

Chads Farm - Photovoltaic Arrays & Battery Storage is the 1,081st-largest of 1,650 power plants planned, permitted or under construction in England and the 1,745th-largest of 2,548 in the United Kingdom by capacity; its 15 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,081st of 1,650171,264 MW<0.1%
United Kingdom1,745th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,090th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 32 grid connections (23 operating, 172 MW), 21 substations, 8 data centers, 3 gas storage facilities and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Salinae Hydrogen Storage projectGas storage facility—Planned22 km
Reinforcement to North Shropshire Electricity Distribution NetworkTransmission line—Permitted23 km
Keuper Underground Gas Storage Facility Material Change 1Gas storage facility—Planned28 km
Internet Central data center, EnglandData center——28 km
Keuper Gas Storage ProjectGas storage facility—Permitted29 km
nLighten ChesterData center——30 km
The Babbage CentreData center——34 km
ChelfordSubstation——39 km
Alderley House grid connectionGrid connection1.8 MWOperating43 km

Operator and place

More from Renewable Connections Developments Limited

Other power plants in England

All 5872 power plants in England, United Kingdom