Power plant · South Cambridgeshire, England, United Kingdom

Kingsway Solar Farm

Kingsway Solar Farm is a planned power plant in South Cambridgeshire, England, United Kingdom, with 500 MW of capacity, operated by Kingsway Solar Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Cambridgeshire (coordinates), England (Eastern)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting.Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (pre-application)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Oct 2026 (reference EN010165, planning authority The Planning Inspectorate, anticipated, expected October 2026)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorKingsway Solar Farm Limited (applicant)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity500 MW (description)Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryPlanning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026
Area6,082 ha (application boundary)planning.data.gov.uk · record · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1427, 0.2833Planning Inspectorate: National Infrastructure Projects · record · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Kingsway Solar Farm is the 70th-largest of 2,174 power plants planned, permitted or under construction in England and the 107th-largest of 3,222 in the United Kingdom by capacity; its 500 MW is 0.17% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England70th of 2,174186,088 MW0.27%
United Kingdom107th of 3,222300,661 MW0.17%
All power plants planned, permitted or under construction in our data249th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 8 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Redcentric CambridgeData center——13 km
West Cambridge Data CentreData center——16 km
US Air Force data center, BrandonData center——34 km
Bramford to TwinsteadTransmission line—Permitted42 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating43 km

Operator and place

More from Kingsway Solar Farm Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page