Grid connection · Scotland, United Kingdom

Jacksbank Renewable Energy Park grid connection

Jacksbank Renewable Energy Park grid connection is a planned grid connection in Scotland, United Kingdom, with 10 MW of capacity, held by The Greenspan Agency.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceJACKSBANK RENEWABLE ENERGY PARK grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connection site: FIDDES)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderThe Greenspan AgencySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toFiddes GSP (via: primary)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toJacksbank Wind Farm (Glenbervie) (method: name+coordinates+technology, distance km: 3.04)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity10 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date18 Mar 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Mar 2027 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates56.9312, -2.3371SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Jacksbank Renewable Energy Park grid connection is the 686th-largest of 1,192 grid connections in Scotland and the 2,147th-largest of 3,903 in the United Kingdom by capacity; its 10 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland686th of 1,19288,894 MW<0.1%
United Kingdom2,147th of 3,903446,745 MW<0.1%
All grid connections in our data5,734th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 160 power plants (38 operating, 1,588 MW) and 74 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Forest Avenue Cottage, Drumlithie - Battery Energy StoragePower plant49.9 MWPermitted0.4 km
Coast Viners Animal Nutrition, Drumlithie - Solar Array & Battery StoragePower plant9.2 MWPermitted1.3 km
Meetlaw Farm, Fordoun - Battery Energy Storage SystemPower plant49.9 MWPermitted1.9 km
Fiddes GSPSubstation——2.3 km
Fetteresso GSPSubstation——3.7 km
Stonehaven PrimarySubstation——7.1 km