Power plant · Aberdeenshire, Scotland, United Kingdom

Forest Avenue Cottage, Drumlithie - Battery Energy Storage

Forest Avenue Cottage, Drumlithie - Battery Energy Storage is a permitted power plant in Aberdeenshire, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Drumlithie Battery Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSite To The North West Of Forest Avenue Cottage Drumlithie Stonehaven, AB39 3YHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Nov 2023 (permit APP/2023/0940, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 May 2023 (ref. APP/2023/0940, Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Nov 2023 (granted, ref. APP/2023/0940, Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDrumlithie Battery LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBatteryDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.9297, -2.3428DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Forest Avenue Cottage, Drumlithie - Battery Energy Storage is the 320th-largest of 872 power plants planned, permitted or under construction in Scotland and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland320th of 87299,272 MW<0.1%
United Kingdom886th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 100 grid connections (30 operating, 306 MW) and 74 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Broadwood grid connectionGrid connection6.56 MWOperating0.4 km
Jacksbank Renewable Energy Park grid connectionGrid connection10 MWPlanned0.4 km
Generation 49.9 MW grid connection at Fettersso GridGrid connection49.9 MWPlanned0.8 km
Fiddes GSPSubstation——2.5 km
Fetteresso GSPSubstation——3.9 km
Stonehaven PrimarySubstation——7.5 km

Operator and place